Verified · Jun 21, 2026

2 working DC fast chargers in Northglenn

All verified working this week, with 18 Level 2 ports across ChargePoint Network, Non-Networked, Tesla.

Live reliability
2 working now none down

Stations · 12

98% working at Colorado · verified Jun 7, 2026

Lowe's - Tesla Supercharger

261 W 104th Ave
Working
Tesla DC Fast 16 ports CCS/SAE Combo + Tesla
98% working
Working
EV Connect DC Fast 4 ports CCS/SAE Combo
90% working

NGLENN EV STNS M&O STATION

12301 Claude Ct
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS REC CENTER

1 E Memorial Pkwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS JAYCEE STATION

10550 Irma Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

RED HAWK RANCH BLDG 15-1

12150 Washington Center Pkwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS CITY HALL W1

11701 Community Center Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS CITY HALL W2

11701 Community Center Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS CITY HALL SW2

11701 Community Center Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NGLENN EV STNS CITY HALL SW1

11701 Community Center Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

O'Meara Ford Center

400 W 104th Ave
Working
Non-Networked Level 2 1 port J1772
98% working

NGLENN EV STNS CITY HALL NW 1

11701 Community Center Drive
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in Colorado costs 16.74¢/kWh — a full charge (60 kWh) costs about $10.04. Compare electricity prices →
All 12 stations active as of 2026-06-21 See full Colorado outage report →

Which EV Charging Networks Operate in Northglenn, CO?

Infrastructure Grade

53% DC Fast

Based on DC Fast Charger ratio

20 of 38 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 12
Ports per Station 3.2

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Northglenn, Colorado has 12 publicly accessible EV charging stations with 38 charging ports. ChargePoint Network operates 75% of stations in the area, followed by Non-Networked at 8.3% — part of Colorado's 2,987 stations statewide.

53% of ports (20) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 47% (18) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Colorado's EV infrastructure compares with Arizona.

What Is the EV Charging Outlook for Northglenn?

High-Speed Charging Hub

Northglenn has exceptional DC fast charging coverage with 53% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Northglenn with 75% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Northglenn?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.