Questions about EV charging?

Latest reported · Nov 9, 2026

7 working DC-fast stations in Loveland

All verified working this week, with 171 Level 2 ports across ChargePoint Network, Blink Network, ENERTECH.

Latest reported availability
7 working now none down

Charging around Loveland, CO

Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.

Map of Loveland charging stations
The interactive map loads as you scroll here. Every station is also listed below.
Loading map…

Active charging locations · 61

98% working at Colorado · verified Nov 9, 2026

Showing 20 useful public-access records selected from 61 active locations. Counts distinguish locations from 198 ports and 64 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Loveland

Northeast · Byrd Dr
7 stations · closest 3.3 km from downtown
Brandon CDJR· 6 Level 2
East · Rocky Mountain Ave
5 stations · closest 2.2 km from downtown
North · Rickenbacker Rd
4 stations · closest 5.8 km from downtown
Southwest · E 3rd St
2 stations · closest 4 km from downtown

Walmart EV Charging

250 W 65th St

Walmart EV Charging on W 65th St has 8 DC fast ports (CCS, Tesla/NACS) on the WALMART network, open 24/7.

Working
WALMART DC Fast 8 ports CCS/SAE Combo + Tesla

Loveland, CO - Tesla Supercharger

4705 Clydesdale Parkway

This charging site at a hotel on Clydesdale Pkwy has 10 DC fast ports (Tesla/NACS) on the Tesla network, open 24/7.

Working
Tesla DC Fast 10 ports Tesla

King Loveland

4175 Byrd Dr

King Loveland on Byrd Dr has 2 DC fast ports (CCS), non-networked and open 24/7.

Working
Non-Networked DC Fast 2 ports CCS/SAE Combo

Target T1178 (Loveland, CO)

1725 Rocky Mountain Ave

Target T1178 (Loveland, CO) on Rocky Mountain Ave has 4 DC fast ports (CCS) on the Electrify America network, open 24/7.

Working
Electrify America DC Fast 4 ports CCS/SAE Combo

XROADSHYUNDAI HYUNDAI EAST ST

3870 Byrd Dr

Xroadshyundai Hyundai East St on Byrd Dr has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

XROADSHYUNDAI WEST

3870 Byrd Dr

Xroadshyundai West on Byrd Dr has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

THUNDER MTN H-D DCFAST HOG

4250 Byrd Dr

Thunder Mtn H-D Dcfast Hog on Byrd Dr has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

LaQuinta Loveland - Enertech

1450 Cascade Ave

LaQuinta Loveland - Enertech on Cascade Ave has 6 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 6 ports J1772

High Plains Village at Centerra

1935 Grays Peak Dr

High Plains Village at Centerra on Grays Peak Dr has 8 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 8 ports J1772

City of Loveland - Civic Center

500 E 3rd St

City of Loveland - Civic Center on E 3rd St has 2 Level 2 ports, non-networked and open 24/7.

Working
Non-Networked Level 2 2 ports J1772

Centerra Condos Loveland - Enertech

1949 Grays Peak Dr

Centerra Condos Loveland - Enertech on Grays Peak Dr has 8 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 8 ports J1772

Lakeshore at Centerra

4795 Hahns Peak Dr

Lakeshore at Centerra on Hahns Peak Dr has 8 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 8 ports J1772

Lakeshore Condos Loveland - Enertech

4795 Hahns Peak Dr

Lakeshore Condos Loveland - Enertech on Hahns Peak Dr has 8 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 8 ports J1772

La Quinta Inn & Suites Loveland/Estes Park

1450 Cascade Ave

La Quinta Inn & Suites Loveland/Estes Park on Cascade Ave has 6 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 6 ports J1772

Railway Flats IV

2054 Cupola Drive

Railway Flats IV on Cupola Dr has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats VI

2184 Cupola Drive

Railway Flats VI on Cupola Dr has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats 1 & II

2055 Hopper Lane

Railway Flats 1 & II on Hopper Ln has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats III

2105 Cupola Drive

Railway Flats III on Cupola Dr has 1 Level 2 port on the Blink Network, open 24/7.

Working
Blink Network Level 2 1 port J1772

Eagle Ridge

5275 Hahns Peak Dr

Eagle Ridge on Hahns Peak Dr has 6 Level 2 ports on the LOOP network, open 24/7.

Working
LOOP Level 2 6 ports J1772

Brandon CDJR

3550 Byrd Dr

Brandon CDJR on Byrd Dr has 6 Level 2 ports on the EV Connect network, open 24/7.

Working
EV Connect Level 2 6 ports J1772

Local charging snapshot

Loveland charging basics

61 public stations with 198 charging ports. 27 DC fast ports (14%) for quicker stops , plus 171 Level 2 ports (86%) for longer stays.

AFDC data last synced November 9, 2026.

61
stations
198
ports
27
DC fast
171
Level 2
Charging costs and cheapest hours in Loveland
Home charging costs
Compare Colorado electricity prices →

Cheapest time to charge today

Colorado isn't part of a wholesale day-ahead electricity market, so the reliable rule still applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Nearby city charging pages around Loveland

EV charging questions for Loveland

Which EV charging networks operate in Loveland, CO?

Loveland has 11 charging networks. ChargePoint Network operates 49.2% of stations, serving 61 total stations.

What is the EV charging outlook for Loveland?

14% of Loveland's charging ports are DC fast chargers and 86% are Level 2. The city has diverse network coverage with 11 providers.

When is the cheapest time to charge an EV in Loveland?

Colorado has no published wholesale day-ahead market curve in this dataset, so the reliable rule applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: November 9, 2026. Availability is periodically refreshed.

🏨 Charge While You Stay — Hotels with EV Charging in Loveland

3 hotels with on-site EV charging · 12 Level 2 ports

Loveland, CO - Tesla Supercharger

DC Fast

4705 Clydesdale Parkway

🔌 10 ports · Public

DC Fast: 80% charge in 30–45 min

📍 View on Map

LaQuinta Loveland - Enertech

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

La Quinta Inn & Suites Loveland/Estes Park

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map