Latest reported · Aug 12, 2026

7 working DC-fast stations in Loveland

All verified working this week, with 169 Level 2 ports across ChargePoint Network, Blink Network, ENERTECH.

Latest reported availability
7 working now none down

Active charging locations · 60

98% working at Colorado · verified Aug 12, 2026

Showing 20 useful public-access records selected from 60 active locations. Counts distinguish locations from 196 ports and 63 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Loveland

Northeast · Byrd Dr
7 stations · closest 3.2 km from downtown
Brandon CDJR· 6 Level 2
East · Rocky Mountain Ave
5 stations · closest 2.1 km from downtown
Medical center of the Rockies· 8 Level 2
North · Rickenbacker Rd
4 stations · closest 5.8 km from downtown
LARIMERCOUNTY FLEET-3· 2 Level 2
Southwest · E 2nd St
2 stations · closest 4.4 km from downtown
LOVELAND PUBWKS FOUNDRY 2· 2 Level 2

Walmart EV Charging

250 W 65Th St

Walmart EV Charging on W 65th St has 8 DC fast ports (CCS, Tesla/NACS) on the WALMART network, open 24/7.

Working
WALMART DC Fast 8 ports CCS/SAE Combo + Tesla

Loveland, CO - Tesla Supercharger

4705 Clydesdale Parkway

This charging site at a hotel on Clydesdale Pkwy has 10 DC fast ports (Tesla/NACS) on the Tesla network, open 24/7.

Working
Tesla DC Fast 10 ports Tesla

King Loveland

4175 Byrd Dr

King Loveland on Byrd Dr has 2 DC fast ports (CCS), non-networked and open 24/7.

Working
Non-Networked DC Fast 2 ports CCS/SAE Combo

Target T1178 (Loveland, CO)

1725 Rocky Mountain Ave

Target T1178 (Loveland, CO) on Rocky Mountain Ave has 4 DC fast ports (CCS) on the Electrify America network, open 24/7.

Working
Electrify America DC Fast 4 ports CCS/SAE Combo

XROADSHYUNDAI HYUNDAI EAST ST

3870 Byrd Dr

Xroadshyundai Hyundai East St on Byrd Dr has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

XROADSHYUNDAI WEST

3870 Byrd Dr

Xroadshyundai West on Byrd Dr has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

THUNDER MTN H-D DCFAST HOG

4250 Byrd Dr

Thunder Mtn H-D Dcfast Hog on Byrd Dr has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

LaQuinta Loveland - Enertech

1450 Cascade Ave

LaQuinta Loveland - Enertech on Cascade Ave has 6 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 6 ports J1772

High Plains Village at Centerra

1935 Grays Peak Dr

High Plains Village at Centerra on Grays Peak Dr has 8 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 8 ports J1772

City of Loveland - Civic Center

500 E 3rd St

City of Loveland - Civic Center on E 3rd St has 2 Level 2 ports, non-networked and open 24/7.

Working
Non-Networked Level 2 2 ports J1772

Centerra Condos Loveland - Enertech

1949 Grays Peak Dr

Centerra Condos Loveland - Enertech on Grays Peak Dr has 8 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 8 ports J1772

Lakeshore at Centerra

4795 Hahns Peak Dr

Lakeshore at Centerra on Hahns Peak Dr has 8 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 8 ports J1772

Lakeshore Condos Loveland - Enertech

4795 Hahns Peak Dr

Lakeshore Condos Loveland - Enertech on Hahns Peak Dr has 8 Level 2 ports on the AUTEL network, open 24/7.

Working
AUTEL Level 2 8 ports J1772

La Quinta Inn & Suites Loveland/Estes Park

1450 Cascade Ave

La Quinta Inn & Suites Loveland/Estes Park on Cascade Ave has 6 Level 2 ports on the ENERTECH network, open 24/7.

Working
ENERTECH Level 2 6 ports J1772

Railway Flats IV

2054 Cupola Drive

Railway Flats IV on Cupola Dr has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats VI

2184 Cupola Drive

Railway Flats VI on Cupola Dr has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats 1 & II

2055 Hopper Lane

Railway Flats 1 & II on Hopper Ln has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats V

2104 Cupola Drive

Railway Flats V on Cupola Dr has 2 Level 2 ports on the Blink Network, open 24/7.

Working
Blink Network Level 2 2 ports J1772

Railway Flats III

2105 Cupola Drive

Railway Flats III on Cupola Dr has 1 Level 2 port on the Blink Network, open 24/7.

Working
Blink Network Level 2 1 port J1772

Eagle Ridge

5275 Hahns Peak Dr

Eagle Ridge on Hahns Peak Dr has 6 Level 2 ports on the LOOP network, open 24/7.

Working
LOOP Level 2 6 ports J1772

Local charging snapshot

Loveland charging basics

60 public stations with 196 charging ports. 27 DC fast ports (14%) for quicker stops , plus 169 Level 2 ports (86%) for longer stays.

AFDC data last synced August 12, 2026.

60
stations
196
ports
27
DC fast
169
Level 2
Charging costs and cheapest hours in Loveland
Home charging costs
Compare Colorado electricity prices →

Cheapest time to charge today

Colorado isn't part of a wholesale day-ahead electricity market, so the reliable rule still applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Nearby city charging pages around Loveland

EV charging questions for Loveland

Which EV charging networks operate in Loveland, CO?

Loveland has 11 charging networks. ChargePoint Network operates 48.3% of stations, serving 60 total stations.

What is the EV charging outlook for Loveland?

14% of Loveland's charging ports are DC fast chargers and 86% are Level 2. The city has diverse network coverage with 11 providers.

When is the cheapest time to charge an EV in Loveland?

Colorado has no published wholesale day-ahead market curve in this dataset, so the reliable rule applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 12, 2026. Availability is periodically refreshed.

🏨 Charge While You Stay — Hotels with EV Charging in Loveland

3 hotels with on-site EV charging · 12 Level 2 ports

Loveland, CO - Tesla Supercharger

DC Fast

4705 Clydesdale Parkway

🔌 10 ports · Public

DC Fast: 80% charge in 30–45 min

📍 View on Map

LaQuinta Loveland - Enertech

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

La Quinta Inn & Suites Loveland/Estes Park

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map