Verified · Jun 21, 2026

6 working DC fast chargers in Loveland

Plus 1 reported down this week and 163 Level 2 ports across ChargePoint Network, Blink Network, Non-Networked.

Live reliability
6 working now 1 reported down

Stations · 60

98% working at Colorado · verified Jun 7, 2026

Embassy Suites by Hilton Loveland Hotel, Spa & Conference Center - Tesla Supercharger

4705 Clydesdale Parkway
Working
Tesla DC Fast 10 ports Tesla
98% working

Centerra Condos Loveland - Enertech

1949 Grays Peak Dr
Working
AUTEL Level 2 8 ports J1772
98% working

Lakeshore Condos Loveland - Enertech

4795 Hahns Peak Dr
Working
AUTEL Level 2 8 ports J1772
98% working

High Plains Village at Centerra

1935 Grays Peak Dr
Working
ENERTECH Level 2 8 ports J1772
98% working

Lakeshore at Centerra

4795 Hahns Peak Dr
Working
ENERTECH Level 2 8 ports J1772
98% working

Parcel Z06 Public Parking Lot

5296 Harvest Lake Dr
Working
Blink Network Level 2 6 ports J1772
95% working
Working
LOOP Level 2 6 ports J1772
98% working

Brandon CDJR

3550 Byrd Dr
Working
EV Connect Level 2 6 ports J1772
90% working

LaQuinta Loveland - Enertech

1450 Cascade Ave
Working
AUTEL Level 2 6 ports J1772
98% working

Rez School - Enertech

6508 E Crossroads Blvd
Working
AUTEL Level 2 6 ports J1772
98% working

La Quinta Inn & Suites Loveland/Estes Park

1450 Cascade Ave
Working
ENERTECH Level 2 6 ports J1772
98% working

Resurrection Church

6502 E Crossroads Blvd
Working
ENERTECH Level 2 6 ports J1772
98% working

Resurrection Christian School

6508 E Crossroads Blvd
Working
ENERTECH Level 2 6 ports J1772
98% working

City of Loveland - Service Center

200 N Wilson Ave
Working
Non-Networked Level 2 4 ports J1772
98% working

Target T1178 (Loveland, CO)

1725 Rocky Mountain Ave
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

4184 St Cloud Dr

4184 St Cloud Dr
Working
Blink Network Level 2 4 ports J1772
95% working

North Loveland Clinic

201 West 69th Street
Working
Blink Network Level 2 4 ports J1772
95% working

Hertz Local Edition #654 - Tesla Destination

345 S Lincoln Ave
Working
Tesla Destination Level 2 3 ports Tesla
98% working

City of Loveland - Civic Center

500 E 3rd St
Working
Non-Networked Level 2 2 ports J1772
98% working

City of Loveland - Public Library

300 Adams St
Working
Non-Networked Level 2 2 ports J1772
98% working
Home charging in Colorado costs 16.74¢/kWh — a full charge (60 kWh) costs about $10.04. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full Colorado outage report →

Which EV Charging Networks Operate in Loveland, CO?

Infrastructure Grade

10% DC Fast

Based on DC Fast Charger ratio

19 of 184 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 60
Ports per Station 3.1

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Loveland, Colorado has 60 publicly accessible EV charging stations with 184 charging ports. ChargePoint Network operates 45% of stations in the area, followed by Blink Network at 16.7% — part of Colorado's 2,987 stations statewide.

10% of ports (19) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 89% (163) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Colorado's EV infrastructure compares with Arizona.

What Is the EV Charging Outlook for Loveland?

Level 2 Focused Infrastructure

Loveland's charging network emphasizes Level 2 charging (89% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 10 different charging networks available, EV drivers in Loveland have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Loveland?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Loveland

2 hotels with on-site EV charging · 12 Level 2 ports

LaQuinta Loveland - Enertech

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

La Quinta Inn & Suites Loveland/Estes Park

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"We are putting in charging stations where people are, where people are running errands. They're going grocery shopping, they go to work. That's where we put our charging stations."

Badar Khan

CEO, EVgo

Source: Yahoo Finance (March 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.