1 working DC fast charger in Wildomar
All verified working this week, with 11 Level 2 ports across ChargePoint Network, Electrify America, Blink Network.
Stations · 3
Cornerstone Community Chruch
34570 Monte Vista DriveInventrust Bear Creek Village Center (Wildomar, CA
Clinton Keith Rd & I-15Which EV Charging Networks Operate in Wildomar, CA?
Infrastructure Grade
27% DC Fast
Based on DC Fast Charger ratio
4 of 15 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Wildomar, California has 3 publicly accessible EV charging stations with 15 charging ports. ChargePoint Network operates 33.3% of stations in the area, followed by Electrify America at 33.3% — part of California's 20,670 stations statewide.
27% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 73% (11) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 987 stations in nearby San Diego, approximately 89 miles away. See how CA compares with Oregon for broader regional context.
What Is the EV Charging Outlook for Wildomar?
Competitive Charging Market
No single network dominates Wildomar, with 3 providers competing to offer the best charging experience.
High-Capacity Stations
Charging stations in Wildomar average 5.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Wildomar?
San Diego, California
Irvine, California
Anaheim, California
Long Beach, California
San Bernardino, California
Fullerton, California
Riverside, California
Newport Beach, California
Costa Mesa, California
Carson, California
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."