Verified · Jun 21, 2026

2 working DC fast chargers in Turlock

All verified working this week, with 39 Level 2 ports across ChargePoint Network, Non-Networked, Tesla.

Live reliability
2 working now none down

Stations · 25

98% working at California · verified Jun 7, 2026

Countryside Plaza - Tesla Supercharger

1680 Countryside Drive
Working
Tesla DC Fast 16 ports Tesla
98% working

Chevron - Tesla Supercharger

2800 Fulkerth Rd
Working
Tesla DC Fast 8 ports Tesla
98% working

Walmart 1963 - Turlock, CA

2111 Fulkerth Road
Working
Electrify America DC Fast 4 ports CHAdeMO + CCS/SAE Combo
98% working

Las Casuelas Restaurant - Tesla Destination

3203 Entertainment Wy
Working
Tesla Destination Level 2 3 ports Tesla
98% working

California State University - Stanislaus

1 University Cir
Working
Non-Networked Level 2 3 ports J1772
98% working

California State University - Stanislaus

1 University Cir
Working
Non-Networked Level 2 2 ports J1772
98% working

California State University - Stanislaus

1 University Cir
Working
Non-Networked Level 2 2 ports J1772
98% working

California State University - Stanislaus

1 University Cir
Working
Non-Networked Level 2 2 ports J1772
98% working

BLUE DIAMOND TURLOCK 1

1300 N Washington Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BLUE DIAMOND TURLOCK 3

1300 N Washington Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BLUE DIAMOND TURLOCK 4

1300 N Washington Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BLUE DIAMOND TURLOCK 2

1300 N Washington Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TID BROADWAY

129 S Broadway
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

INLAND LIBERTY GW 1

3280 Liberty Square Pkwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TID PEDRETTI #1

2400 N Tegner Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TID PEDRETTI #2

2400 N Tegner Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WEST MAIN ST MAIN ST 2

1330 W Main St
Working
ChargePoint Network Level 2 1 port J1772
99% working

WEST MAIN ST MAIN ST 4

1330 W Main St
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 25 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Turlock, CA?

Infrastructure Grade

42% DC Fast

Based on DC Fast Charger ratio

28 of 67 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 25
Ports per Station 2.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Turlock, California has 25 publicly accessible EV charging stations with 67 charging ports. ChargePoint Network operates 68% of stations in the area, followed by Non-Networked at 16% — part of California's 20,670 stations statewide.

42% of ports (28) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 58% (39) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Turlock?

Strong Fast Charging Network

42% of charging ports in Turlock are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Turlock have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Turlock?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.