Verified · Jun 21, 2026

7 working DC fast chargers in Sherman Oaks

All verified working this week, with 20 Level 2 ports across Non-Networked, AMPUP, FLO.

Live reliability
7 working now none down

Stations · 16

98% working at California · verified Jun 7, 2026

Sherman Oaks, CA - Ventura Boulevard (Pay to Park, Floor 3) - Tesla Supercharger

15301 Ventura Boulevard
Working
Tesla DC Fast 40 ports Tesla
98% working

Ralphs on Van Nuys & Burbank

14440 Burbank Blvd
Working
eVgo Network DC Fast 8 ports CCS/SAE Combo
98% working

Chick-fil-A - Store 4413 Sherman Oaks

5043 Van Nuys Blvd
Working
EV Connect Level 2 6 ports J1772
90% working

Best Western Plus Carriage Inn

5525 Sepulveda Blvd
Working
TURNONGREEN Level 2 5 ports J1772
98% working

Ralph's 222 Ventura Blvd

14049 Ventura Blvd
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

Nissan of Van Nuys

5425 Van Nuys Blvd
Working
Non-Networked DC Fast 2 ports CHAdeMO + J1772
98% working

Nissan of Van Nuys

5425 Van Nuys Blvd
Working
Non-Networked Level 2 1 port J1772
98% working

LADWP - Substation DS-73

14061 Riverside Dr
Working
Non-Networked DC Fast 1 port CHAdeMO
98% working

LADWP - Sunnyslope

4847 Sunnyslope Ave
Working
Non-Networked Level 2 1 port J1772
98% working

5242 Kester Ave

5242 Kester Ave
Working
FLO Level 2 1 port J1772
98% working

Gelson's Market

4520 Van Nuys Blvd
Working
eVgo Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
98% working

4332 Hazeltine Ave

4332 Hazeltine Ave
Down
FLO Level 2 1 port J1772
98% working

13735 Burbank Blvd

13735 Burbank Blvd
Working
AMPUP Level 2 1 port J1772
98% working

4623 Willis Ave

4623 Willis Ave
Working
AMPUP Level 2 1 port J1772
98% working

12920 Magnolia Blvd

12920 Magnolia Blvd
Working
AMPUP Level 2 1 port J1772
98% working

13440 Moorpark St

13440 Moorpark St
Working
AMPUP Level 2 1 port J1772
98% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Sherman Oaks, CA?

Infrastructure Grade

73% DC Fast

Based on DC Fast Charger ratio

55 of 75 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 16
Ports per Station 4.7

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Sherman Oaks, California has 16 publicly accessible EV charging stations with 75 charging ports. Non-Networked operates 25% of stations in the area, followed by AMPUP at 25% — part of California's 20,670 stations statewide.

73% of ports (55) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 27% (20) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Sherman Oaks?

High-Speed Charging Hub

Sherman Oaks has exceptional DC fast charging coverage with 73% of ports being high-speed chargers, well above the national average.

Diverse Network Coverage

With 8 different charging networks available, EV drivers in Sherman Oaks have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in Sherman Oaks average 4.7 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Sherman Oaks?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Sherman Oaks

1 hotel with on-site EV charging · 5 Level 2 ports

Best Western Plus Carriage Inn

Level 2

5525 Sepulveda Blvd

🔌 5 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.