Verified · Jun 21, 2026

12 working DC fast chargers in National City

Plus 1 reported down this week and 149 Level 2 ports across ChargePoint Network, Non-Networked, Electrify America.

Live reliability
12 working now 1 reported down

Stations · 38

98% working at California · verified Jun 7, 2026

NAVBASE SAN DIEGO / N00245-B3509-1

Cummings Rd
Working
Non-Networked DC Fast 45 ports CHAdeMO + J1772
98% working

NAVBASE SAN DIEGO / N00245-B3509-1

Cummings Rd
Working
Non-Networked Level 2 44 ports NEMA 14-50
98% working

NAVBASE SAN DIEGO / N00245-PIER8-1,2,3,4,5

3651 Brinster St
Working
Non-Networked Level 2 10 ports NEMA 14-50
98% working

Westfield Plaza Bonita (National City, CA)

3010 Plaza Bonita Rd
Working
Electrify America DC Fast 6 ports CCS/SAE Combo
98% working

Walmart 5023 - National City, CA

1200 Highland Avenue
Working
Electrify America DC Fast 4 ports J1772 + CCS/SAE Combo
98% working

PRP NATIONALCTY B05 B06

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B09 B10

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B17 B18

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B19 B20

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B07 B08

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B13 B14

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B15 B16

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PRP NATIONALCTY B11 B12

2300 Sweetwater Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NAVBASE SAN DIEGO / N00245-PVCAR-1

Brinster St
Working
Non-Networked Level 2 2 ports J1772
98% working

NAVBASE SAN DIEGO / N00245-EVARC-1

Mole Rd
Working
Non-Networked Level 2 2 ports J1772
98% working

LASPALMASPARK A03 & A04

1800 E 22nd St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LASPALMASPARK A01 & A02

1800 E 22nd St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LASPALMASPARK A05 & A06

1800 E 22nd St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LASPALMASPARK A07 & A08

1800 E 22nd St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

2727 HOOVER 2727 HOOVER

2727 Hoover Avenue
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in National City, CA?

Infrastructure Grade

10% DC Fast

Based on DC Fast Charger ratio

16 of 165 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 38
Ports per Station 4.3

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, National City, California has 38 publicly accessible EV charging stations with 165 charging ports. ChargePoint Network operates 68.4% of stations in the area, followed by Non-Networked at 23.7% — part of California's 20,670 stations statewide.

10% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 90% (149) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for National City?

Level 2 Focused Infrastructure

National City's charging network emphasizes Level 2 charging (90% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in National City with 68% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in National City average 4.3 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near National City?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.