Verified · Jun 21, 2026

1 working DC fast charger in Montebello

All verified working this week, with 48 Level 2 ports across ChargePoint Network, Non-Networked, Tesla Destination.

Live reliability
1 working now none down

Stations · 30

98% working at California · verified Jun 7, 2026

Smart & Final - Tesla Supercharger

855 N Wilcox Ave
Working
Tesla DC Fast 64 ports Tesla
98% working

Home2 Suites Los Angeles Montebello - Tesla Destination

988 Via San Clemente
Working
Tesla Destination Level 2 6 ports Tesla
98% working

Home2 Suites by Hilton - Los Angeles Montebello

988 Via San Clemente
Working
Non-Networked Level 2 6 ports J1772
98% working

Hilton Garden Inn Los Angeles Montebello

801 Via San Clemente
Working
Non-Networked Level 2 4 ports J1772
98% working

Montebello Plaza

2401 W. Via Campo
Working
Electrify America DC Fast 3 ports CCS/SAE Combo
98% working

AHWM MONTEBELLO EV3

309 W Beverly Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

AHWM MONTEBELLO EV2

309 W Beverly Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY MONTEBELLO EVARC 275

1600 W Beverly Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY MONTEBELLO EVARC 285-S

506 N 18th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TOPGOLF MB EV STATION 18

2927 Via Campo
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TOPGOLF MB EV STATION 17

2927 Via Campo
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TOPGOLF MB EV STATION 19

2927 Via Campo
Working
ChargePoint Network Level 2 2 ports J1772
99% working

AHWM MONTEBELLO STATION 1

309 W Beverly Blvd
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 8

2927 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 7

2927 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 6

2927 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 5

2927 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 4

2900 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 3

2927 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working

TOPGOLF MB EV STATION 2

2900 Via Campo
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 30 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Montebello, CA?

Infrastructure Grade

58% DC Fast

Based on DC Fast Charger ratio

67 of 115 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 30
Ports per Station 3.8

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Montebello, California has 30 publicly accessible EV charging stations with 115 charging ports. ChargePoint Network operates 80% of stations in the area, followed by Non-Networked at 6.7% — part of California's 20,670 stations statewide.

58% of ports (67) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 42% (48) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Montebello?

High-Speed Charging Hub

Montebello has exceptional DC fast charging coverage with 58% of ports being high-speed chargers, well above the national average.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Montebello have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Montebello?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Montebello

2 hotels with on-site EV charging · 10 Level 2 ports

Home2 Suites by Hilton - Los Angeles Montebello

Level 2

988 Via San Clemente

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

Hilton Garden Inn Los Angeles Montebello

Level 2

801 Via San Clemente

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.