Verified · Jun 21, 2026

2 working DC fast chargers in Lemoore

All verified working this week, with 33 Level 2 ports across Non-Networked, ChargePoint Network, Tesla Destination.

Live reliability
2 working now none down

Stations · 10

98% working at California · verified Jun 7, 2026

Naval Facilities Engineering Command - Naval Air Station Lemoore - Building 750

700 Avenger Ave
Working
Non-Networked Level 2 9 ports J1772
98% working

Tachi Palace Hotel and Casino - Tesla Destination

17225 Jersey Ave
Working
Tesla Destination Level 2 6 ports J1772 + Tesla
98% working

NAS LEMOORE / N63042-B46-1

Skytrain St
Working
Non-Networked Level 2 4 ports J1772
98% working

Employees Only, Leprino Foods, Lemoore West

351 Belle Haven Dr
Working
CHARGELAB Level 2 4 ports J1772
98% working

Caltrans - District 6

455 S Lemoore Ave
Working
Non-Networked Level 2 2 ports J1772
98% working

GF4EVA LEMOORE L2

701 W Cinnamon Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NHC LEMOORE 01

334 W D St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NAS LEMOORE / N63042-B46-1

Skytrain St
Working
Non-Networked Level 2 2 ports NEMA 14-50
98% working

NEX NAS Lemoore 918 Tracker Ave

918 Tracker Ave
Working
Non-Networked Level 2 2 ports NEMA 14-50
98% working

GF4EVA LEMOORE DC

701 W Cinnamon Dr
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 10 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Lemoore, CA?

Infrastructure Grade

3% DC Fast

Based on DC Fast Charger ratio

1 of 34 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 3.4

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Lemoore, California has 10 publicly accessible EV charging stations with 34 charging ports. Non-Networked operates 50% of stations in the area, followed by ChargePoint Network at 30% — part of California's 20,670 stations statewide.

3% of ports (1) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 97% (33) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EV connector types guide. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Lemoore?

Level 2 Focused Infrastructure

Lemoore's charging network emphasizes Level 2 charging (97% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near Lemoore?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Lemoore

1 hotel with on-site EV charging · 1 Tesla Destination · 6 Level 2 ports

Tachi Palace Hotel and Casino

⚡ Tesla

17225 Jersey Ave

🔌 6 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.