Verified · Jun 21, 2026

4 working DC fast chargers in Hanford

All verified working this week, with 75 Level 2 ports across ChargePoint Network, Non-Networked, Blink Network.

Live reliability
4 working now none down

Stations · 50

98% working at California · verified Jun 7, 2026

Fairfield by Marriott Inn & Suites Hanford

2040 Glendale Ave
Working
CHARGIE Level 2 10 ports J1772
98% working

Ez Stop Plaza

1040 S 12th Ave
Working
eVgo Network DC Fast 6 ports CCS/SAE Combo
98% working

Sierra Pacific High School

1259 N 13th Ave
Working
Non-Networked Level 2 2 ports J1772
98% working
Working
Blink Network Level 2 2 ports J1772
95% working
Working
Blink Network Level 2 2 ports J1772
95% working

HPD HFD PD WEST

Fuller Way
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HPD HFD PD CITY HAL

319 N Douty St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HPD HFD PD EAST

Fuller Way
Working
ChargePoint Network Level 2 2 ports J1772
99% working

6TH STREET FAST STATION #2

416 W 6th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

FREEWAY TOYOTA FRONT DEAL LVL2

1835 Glendale Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BERKSHIRE CROSS STATION 1

1850 Centennial Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BOTS HF5&6 SOUTHSIDE

427 W Lacey Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BOTS HF3&4SOUTH SIDE

353 Santa Fe Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BOTS HF7&8 SOUTHSIDE

353 Santa Fe Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HANFORD ESD WILSON

601 Florinda Street
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BERKSHIRE CROSS STATION 2

1850 Centennial Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BERKSHIRE CROSS STATION 3

1850 Centennial Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

US Bank Hanford

225 W 7th St
Working
EVCS DC Fast 2 ports CHAdeMO + CCS/SAE Combo
98% working

DAVIS STREET KPR LOT #6

208 East Eighth Street
Working
ChargePoint Network Level 2 2 ports J1772
99% working

DAVIS STREET KPR LOT #5

208 E Eighth St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Hanford, CA?

Infrastructure Grade

11% DC Fast

Based on DC Fast Charger ratio

9 of 84 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 50
Ports per Station 1.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Hanford, California has 50 publicly accessible EV charging stations with 84 charging ports. ChargePoint Network operates 78% of stations in the area, followed by Non-Networked at 8% — part of California's 20,670 stations statewide.

11% of ports (9) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 89% (75) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Hanford?

Level 2 Focused Infrastructure

Hanford's charging network emphasizes Level 2 charging (89% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Hanford have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Hanford?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Hanford

1 hotel with on-site EV charging · 10 Level 2 ports

Fairfield by Marriott Inn & Suites Hanford

Level 2

2040 Glendale Ave

🔌 10 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.