Verified · Jun 21, 2026

14 working DC fast chargers in Hayward

All verified working this week, with 275 Level 2 ports across ChargePoint Network, EV Connect, Blink Network.

Live reliability
14 working now none down

Stations · 130

98% working at California · verified Jun 7, 2026

Hayward, CA - 249 W Jackson Street - Tesla Supercharger

249 W Jackson St
Working
Tesla DC Fast 20 ports Tesla
98% working

Target - Tesla Supercharger

19661 Hesperian Boulevard
Working
Tesla DC Fast 16 ports Tesla
98% working

HUSD Administration Offices

24411 Amador St
Working
EV Connect Level 2 14 ports J1772
90% working

Ceva Logistics

24493 Clawiter Rd
Working
AMPUP Level 2 12 ports J1772
98% working

Teaspoon Hayward - Tesla Supercharger

25034 Hesperian Blvd
Working
Tesla DC Fast 12 ports Tesla
98% working

Hayward High School

1633 East Ave
Working
EV Connect Level 2 11 ports J1772
90% working

City of Hayward - 805 B St

805 B Street
Down
Blink Network Level 2 10 ports J1772
95% working

Costco Hayward BC #823

22330 Hathaway Avenue
Working
Blink Network Level 2 10 ports J1772
95% working

VAGABOND INN

500 W A St
Working
EVGATEWAY DC Fast 8 ports CHAdeMO + CCS/SAE Combo
98% working

Creekside Center - Hayward CA

20800 Mission Blvd
Working
eVgo Network DC Fast 8 ports CCS/SAE Combo
98% working
Working
eVgo Network DC Fast 6 ports CCS/SAE Combo
98% working

Raising Canes - Mission & Harder

691 Harder Road
Working
Blink Network Level 2 5 ports J1772
95% working

BOA Mission-Sorenson CA4-160 (Hayward, CA)

26801 Mission Blvd
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

St. Rose Hospital

27200 Calaroga Avenue
Working
Blink Network Level 2 4 ports J1772
95% working
Working
LOOP Level 2 4 ports J1772
98% working

Holiday Inn Express & Suites - Hayward (HWDCA)

25640 Mission Blvd
Working
ENVIROSPARK Level 2 4 ports J1772
98% working
Working
eVgo Network DC Fast 3 ports CHAdeMO + J1772
98% working

Hayward Nissan

24644 Mission Blvd
Working
Non-Networked DC Fast 2 ports CHAdeMO + J1772
98% working

Lorin Eden Elementary

27790 Portsmouth Ave
Down
EV Connect Level 2 2 ports J1772
90% working

Schafer Park Elementary School

26268 Flamingo Ave
Working
EV Connect Level 2 2 ports J1772
90% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
5 stations reported unavailable as of 2026-06-21 — check before driving See full California outage report →

Which EV Charging Networks Operate in Hayward, CA?

Infrastructure Grade

23% DC Fast

Based on DC Fast Charger ratio

82 of 357 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 130
Ports per Station 2.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Hayward, California has 130 publicly accessible EV charging stations with 357 charging ports. ChargePoint Network operates 80% of stations in the area, followed by EV Connect at 6.2% — part of California's 20,670 stations statewide.

23% of ports (82) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 77% (275) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Hayward?

Diverse Network Coverage

With 11 different charging networks available, EV drivers in Hayward have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Hayward?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Hayward

1 hotel with on-site EV charging · 4 Level 2 ports

Holiday Inn Express & Suites - Hayward (HWDCA)

Level 2

25640 Mission Blvd

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.