10 EV Charging Stations in Jonesboro, AR

Locations, networks, and charger types — updated weekly from U.S. DOE data

10
Charging Stations

10 EV charging stations in Jonesboro — 3 Non-Networked, 3 Blink Network, 2 EV Connect , 11 public DC fast chargers. Last updated May 9, 2026.

Where Are the 10 Charging Stations in Jonesboro?

Kum & Go - Tesla Supercharger

3920 Southwest Drive
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla Gas Station
Tesla

Embassy Suites by Hilton Jonesboro Red Wolf Convention Center - Tesla Destination

223 Red Wolf Blvd
Tesla

Arkansas Early Learning - Jonesboro

1901 Woodsprings Rd
6pm-6am M-F, 24 hours Sat-Sun
Non-Networked Office Bldg
J1772 (Level 2)

Central Chevrolet

3207 Stadium Blvd
24 hours daily
EV Connect
CCS/SAE Combo

City Water & Light - Monroe

219 E Monroe Ave
24 hours daily
Free
J1772 (Level 2)

City Water & Light - Parking lot NW

312 Madison St #A
24 hours daily
Free
J1772 (Level 2)

Hilton Garden Inn Jonesboro

2840 South Caraway Road
24 hours daily
J1772 (Level 2)

Central Chevrolet

3207 Stadium Blvd
24 hours daily; for dealership use only
Free
Non-Networked Car Dealer
J1772 (Level 2)

Frank Fletcher Dodge Chrysler Jeep Ram

3314 Stadium Blvd
24 hours daily; for dealership use only
Free
Non-Networked Car Dealer
J1772 (Level 2)

CENTRAL PONTIAC-GMC

2907 E Parker Rd
24 hours daily
EV Connect
CCS/SAE Combo
All 10 stations active as of 2026-05-09 See full Arkansas outage report →

Which EV Charging Networks Operate in Jonesboro, AR?

Infrastructure Grade

42% DC Fast

Based on DC Fast Charger ratio

11 of 26 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 2.6

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Jonesboro, Arkansas has 10 publicly accessible EV charging stations with 26 charging ports. Non-Networked operates 30% of stations in the area, followed by Blink Network at 30% — part of Arkansas's 397 stations statewide.

42% of ports (11) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 58% (15) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our EV charging levels guide. View national charging statistics for broader context.

For regional context, see how Arkansas's EV infrastructure compares with Texas.

What Is the EV Charging Outlook for Jonesboro?

Strong Fast Charging Network

42% of charging ports in Jonesboro are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Jonesboro have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Jonesboro?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Jonesboro

1 hotel with on-site EV charging · 1 Tesla Destination · 4 Level 2 ports

Embassy Suites by Hilton Jonesboro Red Wolf Convention Center

⚡ Tesla

223 Red Wolf Blvd

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)