1 working DC fast charger in Roberts
All verified working this week, with 0 Level 2 ports across eVgo Network.
Stations · 1
Which EV Charging Networks Operate in Roberts, WI?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
4 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Roberts, Wisconsin has 1 publicly accessible EV charging station with 4 charging ports. eVgo Network operates 100% of stations in the area — part of Wisconsin's 927 stations statewide.
100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EVgo network. View national charging statistics for broader context.
Drivers needing more charging options can find 146 stations in nearby Minneapolis, approximately 56 miles away. See how WI compares with Michigan for broader regional context.
What Is the EV Charging Outlook for Roberts?
High-Speed Charging Hub
Roberts has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
eVgo Network Stronghold
eVgo Network leads the market in Roberts with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Roberts average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Roberts?
Minneapolis, Minnesota
Saint Paul, Minnesota
Bloomington, Minnesota
Maplewood, Minnesota
Edina, Minnesota
St Louis Park, Minnesota
St. Paul, Minnesota
Eau Claire, Wisconsin
Eagan, Minnesota
Eden Prairie, Minnesota
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."