No working DC fast chargers in Mequon yet
Just 9 Level 2 ports across Blink Network, ChargePoint Network.
Stations · 3
OUTPOST OUTPOST-MEQUON
Outpost Natural Foods 7590 W Mequon RoadWhich EV Charging Networks Operate in Mequon, WI?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 9 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Mequon, Wisconsin has 3 publicly accessible EV charging stations with 9 charging ports. Blink Network operates 66.7% of stations in the area, followed by ChargePoint Network at 33.3% — part of Wisconsin's 927 stations statewide.
All 9 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.
Drivers needing more charging options can find 73 stations in nearby Milwaukee, approximately 20 miles away. See how WI compares with Michigan for broader regional context.
What Is the EV Charging Outlook for Mequon?
Level 2 Focused Infrastructure
Mequon's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Blink Network Stronghold
Blink Network leads the market in Mequon with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Mequon?
Milwaukee, Wisconsin
Oak Creek, Wisconsin
Janesville, Wisconsin
Kenosha, Wisconsin
Mount Pleasant, Wisconsin
Waukesha, Wisconsin
Oconomowoc, Wisconsin
Glendale, Wisconsin
Oshkosh, Wisconsin
Waukegan, Illinois
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."