Verified · Jun 21, 2026

No working DC fast chargers in Waukegan yet

Just 20 Level 2 ports across ChargePoint Network, Tesla Destination, Tesla.

Live reliability
0 working now none down

Stations · 10

98% working at Illinois · verified Jun 7, 2026

American Place Casino - Tesla Supercharger

4011 Fountain Square Place
Working
Tesla DC Fast 20 ports Tesla
98% working

Waukegan National Airport - Tesla Destination

2601 W Plane Rest Dr
Working
Tesla Destination Level 2 4 ports J1772 + Tesla
98% working

Waukegan Harbor & Marina - Tesla Destination

27 E Madison Ave
Working
Tesla Destination Level 2 4 ports J1772 + Tesla
98% working

E4 Charging Solutions - Waukegan Marina

55 South Harbor Place
Working
Blink Network Level 2 4 ports J1772
95% working

EV PILOT 3010 GRAND

3010 Grand Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CLC LAKESHORE 1

30 N Sheridan Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

EV PILOT FLPL 04 SR

18 N County St
Working
ChargePoint Network Level 2 1 port J1772
99% working

EV PILOT FLPL 02 NR

18 N County St
Working
ChargePoint Network Level 2 1 port J1772
99% working

EV PILOT FLPL 01 NL

18 N County St
Working
ChargePoint Network Level 2 1 port J1772
99% working

EV PILOT FLPL 03 SL

18 N County St
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in Illinois costs 18.86¢/kWh — a full charge (60 kWh) costs about $11.32. Compare electricity prices →
All 10 stations active as of 2026-06-21 See full Illinois outage report →

Which EV Charging Networks Operate in Waukegan, IL?

Infrastructure Grade

50% DC Fast

Based on DC Fast Charger ratio

20 of 40 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 4.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Waukegan, Illinois has 10 publicly accessible EV charging stations with 40 charging ports. ChargePoint Network operates 60% of stations in the area, followed by Tesla Destination at 20% — part of Illinois's 1,911 stations statewide.

50% of ports (20) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (20) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Illinois's EV infrastructure compares with Missouri.

What Is the EV Charging Outlook for Waukegan?

High-Speed Charging Hub

Waukegan has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Waukegan with 60% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Waukegan average 4.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Waukegan?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Waukegan

1 hotel with on-site EV charging · 1 Tesla Destination · 4 Level 2 ports

Waukegan Harbor & Marina

⚡ Tesla

27 E Madison Ave

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.