1 EV Charging Stations in Maiden Rock, WI

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Maiden Rock — 1 ZEFNET . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Maiden Rock?

Vino in the Valley

null W3826 450th Avenue
ZEFNET
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full Wisconsin outage report →

Which EV Charging Networks Operate in Maiden Rock, WI?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Maiden Rock, Wisconsin has 1 publicly accessible EV charging station with 2 charging ports. ZEFNET operates 100% of stations in the area — part of Wisconsin's 918 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 146 stations in nearby Minneapolis, approximately 81 miles away. See how WI compares with Michigan for broader regional context.

What Is the EV Charging Outlook for Maiden Rock?

Level 2 Focused Infrastructure

Maiden Rock's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

ZEFNET Stronghold

ZEFNET leads the market in Maiden Rock with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Maiden Rock?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)