1 EV Charging Stations in Entiat, WA
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Entiat — 1 Tesla , 8 public DC fast chargers. Last updated May 9, 2026.
Where Are the 1 Charging Stations in Entiat?
Which EV Charging Networks Operate in Entiat, WA?
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
8 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Entiat, Washington has 1 publicly accessible EV charging station with 8 charging ports. Tesla operates 100% of stations in the area — part of Washington's 3,235 stations statewide.
100% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 21 stations in nearby Wenatchee, approximately 28 miles away. See how WA compares with Oregon for broader regional context.
What Is the EV Charging Outlook for Entiat?
High-Speed Charging Hub
Entiat has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Tesla Stronghold
Tesla leads the market in Entiat with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Entiat average 8.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Entiat?
Wenatchee, Washington
Leavenworth, Washington
Ellensburg, Washington
East Wenatchee, Washington
Winthrop, Washington
Moses Lake, Washington
Chelan, Washington
Manson, Washington
Quincy, Washington
Cle Elum, Washington
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."