Verified · Jun 21, 2026

No working DC fast chargers in Hinesburg yet

Just 4 Level 2 ports across Non-Networked, Blink Network.

Live reliability
0 working now none down

Stations · 2

98% working at Vermont · verified Jun 7, 2026

Renewable NRG Systems

110 Riggs Rd
Working
Non-Networked Level 2 2 ports J1772
98% working
Working
Blink Network Level 2 2 ports J1772
95% working
Home charging in Vermont costs 24.11¢/kWh — a full charge (60 kWh) costs about $14.47. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Vermont outage report →

Which EV Charging Networks Operate in Hinesburg, VT?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Hinesburg, Vermont has 2 publicly accessible EV charging stations with 4 charging ports. Non-Networked operates 50% of stations in the area, followed by Blink Network at 50% — part of Vermont's 562 stations statewide.

All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 92 stations in nearby Burlington, approximately 17 miles away. See how VT compares with New York for broader regional context.

What Is the EV Charging Outlook for Hinesburg?

Level 2 Focused Infrastructure

Hinesburg's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near Hinesburg?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.