Verified · Jun 21, 2026

7 working DC fast chargers in Burlington

All verified working this week, with 160 Level 2 ports across ChargePoint Network, AMPUP, EVMATCH.

Live reliability
7 working now none down

Stations · 92

98% working at Vermont · verified Jun 7, 2026

Cambrian Rise

341 North Ave
Working
EVMATCH Level 2 6 ports J1772
98% working

Sunset House

70 Cambrian Way
Working
EVMATCH Level 2 4 ports J1772
98% working

B E CHARGERS BE03

45 Cherry St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE04

585 Pine St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE08

81 Carrigan Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE09

210 Colchester Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE10

146 University Place
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE12

1127 North Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY MARKET SE STATION 1

207 Flynn Avenue
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE11

95 Summit St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Hotel Vermont - Tesla Destination

41 Cherry St
Working
Tesla Destination Level 2 2 ports Tesla
98% working

UVM 109 SOUTH PROSP

109 S Prospect St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UVM ALLEN HOUSE STN

461 Main Street
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UVM CONVERSE 2

75 Colchester Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

180 BURTON STATION 1

180 Queen City Park Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Burlington Electric Department - 585 Pine St

585 Pine Street
Working
FLO Level 2 2 ports J1772
98% working

B E CHARGERS BE02

45 Cherry St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

B E CHARGERS BE13

1127 North Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UVM CONVERSE 1

75 Colchester Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HULA LAKESIDE STATION 1

50 Lakeside Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Vermont costs 24.11¢/kWh — a full charge (60 kWh) costs about $14.47. Compare electricity prices →
All 92 stations active as of 2026-06-21 See full Vermont outage report →

Charge While You Sleep in Burlington

5 hotels offer on-site EV charging — 12 Level 2 ports, 2 Tesla Destination. Wake up to a full battery.

Hotels with EV Charging in Burlington, Vermont →

Which EV Charging Networks Operate in Burlington, VT?

Infrastructure Grade

3% DC Fast

Based on DC Fast Charger ratio

5 of 165 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 92
Ports per Station 1.8

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Burlington, Vermont has 92 publicly accessible EV charging stations with 165 charging ports. ChargePoint Network operates 81.5% of stations in the area, followed by AMPUP at 7.6% — part of Vermont's 562 stations statewide.

3% of ports (5) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 97% (160) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Vermont's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Burlington?

Level 2 Focused Infrastructure

Burlington's charging network emphasizes Level 2 charging (97% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Burlington have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Burlington?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Burlington

5 hotels with on-site EV charging · 2 Tesla Destination · 12 Level 2 ports

See all 5 hotels →

Hotel Vermont

⚡ Tesla

41 Cherry St

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.