2 EV Charging Stations in Grafton, VT
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in Grafton — 1 Tesla Destination, 1 Blink Network . Last updated May 9, 2026.
Where Are the 2 Charging Stations in Grafton?
Which EV Charging Networks Operate in Grafton, VT?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 3 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Grafton, Vermont has 2 publicly accessible EV charging stations with 3 charging ports. Tesla Destination operates 50% of stations in the area, followed by Blink Network at 50% — part of Vermont's 562 stations statewide.
All 3 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 71 stations in nearby Saratoga Springs, approximately 95 miles away. See how VT compares with New York for broader regional context.
What Is the EV Charging Outlook for Grafton?
Level 2 Focused Infrastructure
Grafton's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Where Else Can I Charge Near Grafton?
Saratoga Springs, New York
Troy, New York
Amherst, Massachusetts
Northampton, Massachusetts
Manchester, New Hampshire
Queensbury, New York
Greenfield, Massachusetts
Lake George, New York
Cohoes, New York
Malta, New York
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Grafton
1 hotel with on-site EV charging · 1 Tesla Destination · 1 Level 2 ports
Grafton Inn
⚡ Tesla92 Main St
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."