1 EV Charging Stations in Albans, VT

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Albans — 1 RED_E . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Albans?

Green Dolphin LLC

45 Kingman St
RED_E Public
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full Vermont outage report →

Which EV Charging Networks Operate in Albans, VT?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Albans, Vermont has 1 publicly accessible EV charging station with 2 charging ports. RED_E operates 100% of stations in the area — part of Vermont's 562 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 92 stations in nearby Burlington, approximately 39 miles away. See how VT compares with New York for broader regional context.

What Is the EV Charging Outlook for Albans?

Level 2 Focused Infrastructure

Albans's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

RED_E Stronghold

RED_E leads the market in Albans with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Albans?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)