1 working DC fast charger in Mount Pleasant
All verified working this week, with 0 Level 2 ports across Blink Network.
Stations · 1
EAG Ford/Dodge Mt. Pleasant - DCFC
2045 West Burton RoadWhich EV Charging Networks Operate in Mount Pleasant, TX?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
6 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Mount Pleasant, Texas has 1 publicly accessible EV charging station with 6 charging ports. Blink Network operates 100% of stations in the area — part of Texas's 3,983 stations statewide.
100% of ports (6) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our Blink network. View national charging statistics for broader context.
Drivers needing more charging options can find 19 stations in nearby Tyler, approximately 100 miles away. See how TX compares with New Mexico for broader regional context.
What Is the EV Charging Outlook for Mount Pleasant?
High-Speed Charging Hub
Mount Pleasant has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Blink Network Stronghold
Blink Network leads the market in Mount Pleasant with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Mount Pleasant average 6.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Mount Pleasant?
Tyler, Texas
Longview, Texas
Texarkana, Texas
Paris, Texas
Sulphur Springs, Texas
Marshall, Texas
Texarkana, Arkansas
Lindale, Texas
Mt. Pleasant, Texas
New Boston, Texas
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."