Verified · Jun 21, 2026

No working DC fast chargers in Oak Ridge National Laboratory yet

Just 34 Level 2 ports across Non-Networked.

Live reliability
0 working now none down

Stations · 10

98% working at Tennessee · verified Jun 7, 2026

Oak Ridge National Laboratory - Station 8

1 Bethel Valley Rd
Working
Non-Networked Level 2 16 ports J1772
98% working

Oak Ridge National Laboratory - Station 6

1 Bethel Valley Rd
Working
Non-Networked Level 2 4 ports J1772
98% working

Oak Ridge National Laboratory - Station 7

1 Bethel Valley Rd
Working
Non-Networked Level 2 4 ports J1772
98% working

Oak Ridge National Laboratory - Station 10

1 Bethel Valley Rd
Working
Non-Networked Level 2 3 ports J1772
98% working

Oak Ridge National Laboratory - Station 9

1 Bethel Valley Rd
Working
Non-Networked Level 2 2 ports J1772
98% working

Oak Ridge National Laboratory - Station 1

1 Bethel Valley Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Oak Ridge National Laboratory - Station 2

1 Bethel Valley Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Oak Ridge National Laboratory - Station 3

1 Bethel Valley Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Oak Ridge National Laboratory - Station 4

1 Bethel Valley Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Oak Ridge National Laboratory - Station 5

1 Bethel Valley Rd
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Tennessee costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
All 10 stations active as of 2026-06-21 See full Tennessee outage report →

Which EV Charging Networks Operate in Oak Ridge National Laboratory, TN?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 34 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 3.4

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Oak Ridge National Laboratory, Tennessee has 10 publicly accessible EV charging stations with 34 charging ports. Non-Networked operates 100% of stations in the area — part of Tennessee's 1,243 stations statewide.

All 34 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

For regional context, see how Tennessee's EV infrastructure compares with Georgia.

What Is the EV Charging Outlook for Oak Ridge National Laboratory?

Level 2 Focused Infrastructure

Oak Ridge National Laboratory's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Oak Ridge National Laboratory with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Oak Ridge National Laboratory?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.