Verified · Jun 21, 2026

8 working DC fast chargers in Knoxville

Plus 1 reported down this week and 178 Level 2 ports across Blink Network, Non-Networked, ChargePoint Network.

Live reliability
8 working now 1 reported down

Stations · 68

98% working at Tennessee · verified Jun 7, 2026

Livano Knoxville

465 West Blount Avenue
Working
Blink Network Level 2 24 ports J1772
95% working

Target - Tesla Supercharger

8040 Ray Mears Blvd
Working
Tesla DC Fast 16 ports Tesla
98% working

Embassy Suites Knoxville West - Tesla Destination

9621 Parkside Dr
Working
Tesla Destination Level 2 10 ports J1772 + Tesla
98% working

Pavilion of Turkey Creek - Tesla Supercharger

10936 Parkside Dr
Working
Tesla DC Fast 8 ports Tesla
98% working

Brookview Town Centre - Tesla Supercharger

250 Brookview Centre Way
Working
Tesla DC Fast 8 ports Tesla
98% working

Downtown Knoxville

378 South Central Street
Working
ZEFNET DC Fast 8 ports CHAdeMO + CCS/SAE Combo
98% working

Electric Power Research Institute (EPRI) - Knoxville

942 Corridor Park Blvd
Working
Non-Networked Level 2 7 ports J1772
98% working

University of Tennessee - Staff Area 23

1350 Pat Head Summitt St
Working
Non-Networked Level 2 6 ports J1772
98% working

University of Tennessee - Agriculture Campus

2402 Chapman Dr
Working
Non-Networked Level 2 6 ports J1772
98% working

Cross Park Realty Partners LLC

9111 Cross Park Dr
Working
Blink Network Level 2 6 ports J1772
95% working

Stockyard Lofts

215 Willow Ave
Working
Blink Network Level 2 6 ports J1772
95% working

City of Knoxville Public Safety Complex

1650 Huron Street
Working
Blink Network Level 2 6 ports J1772
95% working

Brookview Promenade

265 Brookview Centre Way
Working
Blink Network Level 2 4 ports J1772
95% working

Walmart 2065 - Knoxville, TN

8445 Walbrook Drive
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

Market Square Parking Garage

406 Walnut St
Working
Non-Networked Level 2 4 ports J1772
98% working

State Street Garage

500 State St
Working
Non-Networked Level 2 4 ports J1772
98% working

Locust Street Parking Garage

540 Locust St SW
Working
Non-Networked Level 2 4 ports J1772
98% working

Flying J 722

800 Watt Rd
Working
eVgo Network DC Fast 4 ports CCS/SAE Combo
98% working

Lakeshore Park

5930 Lyons View Pike
Working
Non-Networked Level 2 4 ports J1772
98% working

University of Tennessee - 11th Street Parking Garage

1101 Cumberland Ave
Working
Non-Networked DC Fast 3 ports CHAdeMO + J1772
98% working
Home charging in Tennessee costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full Tennessee outage report →

Which EV Charging Networks Operate in Knoxville, TN?

Infrastructure Grade

23% DC Fast

Based on DC Fast Charger ratio

54 of 232 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 68
Ports per Station 3.4

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Knoxville, Tennessee has 68 publicly accessible EV charging stations with 232 charging ports. Blink Network operates 36.8% of stations in the area, followed by Non-Networked at 32.4% — part of Tennessee's 1,243 stations statewide.

23% of ports (54) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 77% (178) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our Blink network. View national charging statistics for broader context.

For regional context, see how Tennessee's EV infrastructure compares with Georgia.

What Is the EV Charging Outlook for Knoxville?

Diverse Network Coverage

With 8 different charging networks available, EV drivers in Knoxville have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Knoxville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Knoxville

2 hotels with on-site EV charging · 1 Tesla Destination · 10 Level 2 ports

Embassy Suites Knoxville West

⚡ Tesla

9621 Parkside Dr

🔌 10 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

Brookview Town Centre - Tesla Supercharger

DC Fast

250 Brookview Centre Way

🔌 8 ports · Public

DC Fast: 80% charge in 30–45 min

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.