1 EV Charging Stations in Monterey, TN
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Monterey — 1 ChargePoint Network . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Monterey?
Which EV Charging Networks Operate in Monterey, TN?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Monterey, Tennessee has 1 publicly accessible EV charging station with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Tennessee's 1,232 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 17 stations in nearby Oak Ridge, approximately 92 miles away. See how TN compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Monterey?
Level 2 Focused Infrastructure
Monterey's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Monterey with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Monterey?
Oak Ridge, Tennessee
Cookeville, Tennessee
Lebanon, Tennessee
Crossville, Tennessee
Oak Ridge National Laboratory, Tennessee
McMinnville, Tennessee
Harriman, Tennessee
Lenoir City, Tennessee
Athens, Tennessee
Kingston, Tennessee
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."