Verified · Jun 21, 2026

6 working DC fast chargers in Greeneville

Plus 1 reported down this week and 7 Level 2 ports across ChargePoint Network, Non-Networked, Tesla Destination.

Live reliability
6 working now 1 reported down

Stations · 10

98% working at Tennessee · verified Jun 7, 2026

General Morgan Inn - Tesla Destination

111 N Main St
Working
Tesla Destination Level 2 3 ports Tesla
98% working

GEA-1 STATION 2 (TA)

195 Van Hill Rd
Working
ChargePoint Network DC Fast 2 ports CCS/SAE Combo
99% working

GEA-1 STATION 3 (TA)

195 Van Hill Rd
Down
ChargePoint Network DC Fast 2 ports CCS/SAE Combo
99% working

GEA-1 STATION 1 (TA)

195 Van Hill Rd
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

Greeneville Light & Power System

110 N College St
Working
Non-Networked Level 2 1 port J1772
98% working

Bachman Bernard Chevrolet Buick GMC

3365 E Andrew Johnson Hwy
Working
Non-Networked Level 2 1 port J1772
98% working

GEA-1 STATION 2 (R)

885 W Andrew Johnson Hwy
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo + Tesla
99% working

GEA-1 STATION 1 (L)

885 W Andrew Johnson Hwy
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

FIRST TN HRA GVILLE CONNECT1

217 South College Street
Working
ChargePoint Network Level 2 1 port J1772
99% working

FIRST TN HRA GVILLE CONNECT2

217 South College Street
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in Tennessee costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full Tennessee outage report →

Which EV Charging Networks Operate in Greeneville, TN?

Infrastructure Grade

50% DC Fast

Based on DC Fast Charger ratio

7 of 14 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 1.4

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Greeneville, Tennessee has 10 publicly accessible EV charging stations with 14 charging ports. ChargePoint Network operates 70% of stations in the area, followed by Non-Networked at 20% — part of Tennessee's 1,243 stations statewide.

50% of ports (7) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (7) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Tennessee's EV infrastructure compares with Georgia.

What Is the EV Charging Outlook for Greeneville?

High-Speed Charging Hub

Greeneville has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Greeneville with 70% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Greeneville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Greeneville

1 hotel with on-site EV charging · 1 Tesla Destination · 3 Level 2 ports

General Morgan Inn

⚡ Tesla

111 N Main St

🔌 3 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.