5 EV Charging Stations in Athens, TN
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Athens, Tennessee has 5 publicly accessible EV charging stations with 9 charging ports. ChargePoint Network operates 60% of stations in the area, followed by EV Connect at 20% — part of Tennessee's 1,219 stations statewide.
56% of ports (5) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 44% (4) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how Tennessee's EV infrastructure compares with Georgia.
5 EV charging stations in Athens — 3 ChargePoint Network, 1 EV Connect, 1 Tesla Destination , 5 public DC fast chargers. Last updated March 2026.
Infrastructure Grade
56% DC Fast
Based on DC Fast Charger ratio
5 of 9 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Athens, TN?
Where Are the 5 Charging Stations in Athens?
What Is the EV Charging Outlook for Athens?
High-Speed Charging Hub
Athens has exceptional DC fast charging coverage with 56% of ports being high-speed chargers, well above the national average.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Athens with 60% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Athens?
Chattanooga, Tennessee
Knoxville, Tennessee
Oak Ridge, Tennessee
Crossville, Tennessee
Oak Ridge National Laboratory, Tennessee
Dalton, Georgia
Cleveland, Tennessee
Ooltewah, Tennessee
Harriman, Tennessee
Alcoa, Tennessee
Data source: U.S. Department of Energy — Alternative Fuels Data Center
🏨 Charge While You Stay — Hotels with EV Charging in Athens
1 hotel with on-site EV charging · 1 Tesla Destination · 4 Level 2 ports
Comfort Inn
⚡ Tesla2811 Decatur Pike
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."