Latest reported · Aug 10, 2026

5 working DC-fast stations in Myrtle Beach

All verified working this week, with 82 Level 2 ports across ChargePoint Network, Tesla Destination, Blink Network.

Latest reported availability
5 working now none down

Active charging locations · 37

97% working at South Carolina · verified Aug 10, 2026

Showing 20 useful public-access records selected from 37 active locations. Counts distinguish locations from 105 ports and 44 connector-type records; availability is periodically refreshed, not live.

Myrtle Beach, SC - Tesla Supercharger

2000 Coastal Grand Circle
Working
Tesla DC Fast 10 ports Tesla

FALCON CUSTOMER CHARGE

760 Frontage Rd E
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

CBL Coastal Grand Mall (Myrtle Beach, SC)

2000 Coastal Grand Cir
Working
Electrify America DC Fast 6 ports CCS/SAE Combo

CircleK - Myrtle Beach, SC

422 George Bishop Pkwy
Working
CIRCLE_K DC Fast 4 ports CCS/SAE Combo

FALCON INVENTORY CHRG

760 Frontage Rd E
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

Best Western Plus Grand Strand Inn & Suites - Tesla Destination

1804 S Ocean Blvd
Working
Tesla Destination Level 2 3 ports J1772 + Tesla

Courtyard Myrtle Beach

1000 Commons Blvd
Working
ENVIROSPARK Level 2 4 ports J1772

The Caribbean Resort & Villas - Tesla Destination

3000 N Ocean Blvd
Working
Tesla Destination Level 2 2 ports J1772 + Tesla

Hilton Myrtle Beach Resort - Tesla Destination

10000 Beach Club Dr
Working
Tesla Destination Level 2 1 port Tesla

Embassy Suites Myrtle Beach Oceanfront Resort - Tesla Destination

9800 Queensway Blvd
Working
Tesla Destination Level 2 1 port Tesla

Club Wyndham Seawatch South Tower Parking Garage

151 Seawatch Drive
Working
Blink Network Level 2 4 ports J1772

Dunes Village Resort - Tesla Destination

5200 N Ocean Blvd
Working
Tesla Destination Level 2 6 ports Tesla

Ocean Lakes Family Campground

6001 S Kings Hwy
Working
Non-Networked Level 2 2 ports J1772 + NEMA 14-50

Myrtle Beach State Park

4401 South King Highway
Working
RIVIAN_WAYPOINTS Level 2 2 ports J1772

The Cottages at Myrtle Beach

388 Hinson Drive
Working
Blink Network Level 2 6 ports J1772

Apache Family Campground

9700 Kings Rd
Working
Non-Networked Level 2 1 port J1772

Portside at Grande Dunes

1041 Portside Dr
Working
Blink Network Level 2 4 ports J1772

SEAPATH ON 67TH EV STATION 02

604 67th Ave N
Working
ChargePoint Network Level 2 2 ports J1772

GRANDVIEW APTS. EV STATION 2

3117 Bramble Glen Dr
Working
ChargePoint Network Level 2 2 ports J1772

Club Wyndham Registration Building Garage

151 Seawatch Drive
Working
Blink Network Level 2 4 ports J1772

Local charging snapshot

Myrtle Beach charging basics

37 public stations with 105 charging ports. 22 DC fast ports (21%) for quicker stops , plus 82 Level 2 ports (78%) for longer stays.

AFDC data last synced August 10, 2026.

37
stations
105
ports
22
DC fast
82
Level 2

Charge While You Sleep in Myrtle Beach

5 hotels offer on-site EV charging — 11 Level 2 ports, 4 Tesla Destination. Wake up to a full battery.

Hotels with EV Charging in Myrtle Beach, South Carolina →
Charging costs and cheapest hours in Myrtle Beach
Home charging costs
Compare South Carolina electricity prices →

Cheapest time to charge today

South Carolina isn't part of a wholesale day-ahead electricity market, so the reliable rule still applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Nearby city charging pages around Myrtle Beach

EV charging questions for Myrtle Beach

Which EV charging networks operate in Myrtle Beach, SC?

Myrtle Beach has 9 charging networks. ChargePoint Network operates 37.8% of stations, serving 37 total stations.

What is the EV charging outlook for Myrtle Beach?

21% of Myrtle Beach's charging ports are DC fast chargers and 78% are Level 2. The city has diverse network coverage with 9 providers.

When is the cheapest time to charge an EV in Myrtle Beach?

South Carolina has no published wholesale day-ahead market curve in this dataset, so the reliable rule applies: charge during your utility's overnight off-peak window, about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.

🏨 Charge While You Stay — Hotels with EV Charging in Myrtle Beach

5 hotels with on-site EV charging · 4 Tesla Destination · 11 Level 2 ports

See all 5 hotels →

Courtyard Myrtle Beach

Level 2

1000 Commons Blvd

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

Best Western Plus Grand Strand Inn & Suites

⚡ Tesla

1804 S Ocean Blvd

🔌 3 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

The Caribbean Resort & Villas

⚡ Tesla

3000 N Ocean Blvd

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map