3 EV Charging Stations in Clover, SC
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Clover — 2 Non-Networked, 1 EV Connect , 3 public DC fast chargers. Last updated May 9, 2026.
Where Are the 3 Charging Stations in Clover?
Which EV Charging Networks Operate in Clover, SC?
Infrastructure Grade
75% DC Fast
Based on DC Fast Charger ratio
3 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Clover, South Carolina has 3 publicly accessible EV charging stations with 4 charging ports. Non-Networked operates 66.7% of stations in the area, followed by EV Connect at 33.3% — part of South Carolina's 745 stations statewide.
75% of ports (3) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 25% (1) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.
Drivers needing more charging options can find 295 stations in nearby Charlotte, approximately 35 miles away. See how SC compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Clover?
High-Speed Charging Hub
Clover has exceptional DC fast charging coverage with 75% of ports being high-speed chargers, well above the national average.
Non-Networked Stronghold
Non-Networked leads the market in Clover with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Clover?
Charlotte, North Carolina
Mooresville, North Carolina
Gastonia, North Carolina
Concord, North Carolina
Spartanburg, South Carolina
Greer, South Carolina
Huntersville, North Carolina
Rock Hill, South Carolina
Statesville, North Carolina
Salisbury, North Carolina
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."