2 EV Charging Stations in Slatington, PA
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in Slatington — 1 EV Connect, 1 Non-Networked , 4 public DC fast chargers. Last updated March 29, 2026.
Where Are the 2 Charging Stations in Slatington?
Which EV Charging Networks Operate in Slatington, PA?
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
4 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Apr 3, 2026
Data sourced from U.S. DOE AFDC
As of April 2026, Slatington, Pennsylvania has 2 publicly accessible EV charging stations with 4 charging ports. EV Connect operates 50% of stations in the area, followed by Non-Networked at 50% — part of Pennsylvania's 2,082 stations statewide.
100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.
Drivers needing more charging options can find 173 stations in nearby Philadelphia, approximately 96 miles away. See how PA compares with New York for broader regional context.
What Is the EV Charging Outlook for Slatington?
High-Speed Charging Hub
Slatington has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Where Else Can I Charge Near Slatington?
Philadelphia, Pennsylvania
Allentown, Pennsylvania
Lancaster, Pennsylvania
King of Prussia, Pennsylvania
Bethlehem, Pennsylvania
Madison, New Jersey
Reading, Pennsylvania
Princeton, New Jersey
Conshohocken, Pennsylvania
Easton, Pennsylvania
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 29, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."