Verified · Jun 21, 2026

6 working DC fast chargers in Easton

All verified working this week, with 42 Level 2 ports across ChargePoint Network, Blink Network, Non-Networked.

Live reliability
6 working now none down

Stations · 20

98% working at Pennsylvania · verified Jun 7, 2026

Sheetz - Tesla Supercharger

100 Trolley Line Drive Building B1
Working
Tesla DC Fast 8 ports Tesla
98% working
Working
RED_E DC Fast 8 ports J1772 + CCS/SAE Combo
96% working

St. Lukes Hospital - Anderson Campus

1872 St. Luke's Blvd
Working
Blink Network Level 2 6 ports J1772
95% working

Hecktown Oaks Campus - South

3780 Hecktown Road
Working
Blink Network Level 2 4 ports J1772
95% working

Hecktown Oaks Campus - North

3780 Hecktown Road
Working
Blink Network Level 2 4 ports J1772
95% working

KOCH 33 TOYOTA SOUTH STATION

3816 Hecktown Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

AAA Northampton County

3914 Hecktown Rd
Working
Non-Networked Level 2 2 ports J1772
98% working

NORTHAMPTON CO. WOLF AVE LOT #2

669 Washington St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

KOCH 33 TOYOTA KOCH 33 TOYOTA

3816 Hecktown Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NORTHAMPTON CO. WOLF AVE LOT #1

669 Washington St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Grand Eastonian

140 Northampton St
Working
UNIVERSAL Level 2 2 ports J1772
98% working

SHSUITESEASTON SEPEV4ADA

3774 Eastgate Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

SHSUITESEASTON SEPEV3LEFT

3774 Eastgate Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WRENCHTEC WRENCHTEC

3315 Sullivan trail
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Health Center at Easton

2401 Northampton St.
Working
Blink Network Level 2 2 ports J1772
95% working

Health Center at Palmer Township

3701 Corriere Road
Working
Blink Network Level 2 2 ports J1772
95% working

3914 Hecktown Road

3914 Hecktown Rd
Working
CHARGELAB Level 2 2 ports J1772
98% working
Working
EV Connect DC Fast 2 ports CCS/SAE Combo
90% working
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

BDHDELIVERY STATION1

3901 Hecktown Rd
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working
Home charging in Pennsylvania costs 20.92¢/kWh — a full charge (60 kWh) costs about $12.55. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full Pennsylvania outage report →

Which EV Charging Networks Operate in Easton, PA?

Infrastructure Grade

28% DC Fast

Based on DC Fast Charger ratio

16 of 58 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 20
Ports per Station 2.9

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Easton, Pennsylvania has 20 publicly accessible EV charging stations with 58 charging ports. ChargePoint Network operates 45% of stations in the area, followed by Blink Network at 25% — part of Pennsylvania's 2,153 stations statewide.

28% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 72% (42) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Pennsylvania's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Easton?

Diverse Network Coverage

With 8 different charging networks available, EV drivers in Easton have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Easton?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Easton

1 hotel with on-site EV charging · 2 Level 2 ports

Grand Eastonian

Level 2

140 Northampton St

🔌 2 ports · Public

Level 2: ~40–80mi range added per hour overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.