Verified · Jun 21, 2026

10 working DC fast chargers in Monroeville

All verified working this week, with 49 Level 2 ports across ChargePoint Network, Non-Networked, Blink Network.

Live reliability
10 working now none down

Stations · 34

98% working at Pennsylvania · verified Jun 7, 2026

GetGo Gas Station - Tesla Supercharger

317 Old Haymaker Rd
Working
Tesla DC Fast 6 ports Tesla
98% working

Flats At Fox Hill

1120 Fox Hill Dr
Working
OpConnect Level 2 6 ports J1772
98% working

Walnut - Penn Place

4145 William Penn Highway
Working
eVgo Network DC Fast 6 ports CCS/SAE Combo
98% working

Giant Eagle Supermarket - Tesla Destination

4010 Monroeville Blvd
Working
Tesla Destination Level 2 3 ports J1772 + Tesla
98% working

University of Pittsburgh Medical Center East

2775 Mosside Blvd
Working
Non-Networked Level 2 2 ports J1772
98% working

Ford of Monroeville

3696 William Penn Hwy
Working
Non-Networked Level 2 2 ports J1772
98% working

Monroeville KIA Dealership

3721 William Penn Hwy
Working
Blink Network Level 2 2 ports J1772
95% working

COCHRANAUTO MVL2 BANK C

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COCHRANAUTO MVL2 BANK F

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COCHRANAUTO MVL2 BANK B

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COCHRANAUTO MVL2 BANK E

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COCHRANAUTO MVL2 BANK A

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

COCHRANAUTO MVL2 BANK D

4520 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
Blink Network Level 2 2 ports J1772
95% working

A&L BMW FRONT END

3780 William Penn Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UPMC EAST STATION 5

2775 Mosside Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UPMC EAST STATION 1

2775 Mosside Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UPMC EAST STATION 2

2775 Mosside Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UPMC EAST STATION 4

2775 Mosside Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

UPMC EAST STATION 3

2775 Mosside Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Pennsylvania costs 20.92¢/kWh — a full charge (60 kWh) costs about $12.55. Compare electricity prices →
All 34 stations active as of 2026-06-21 See full Pennsylvania outage report →

Which EV Charging Networks Operate in Monroeville, PA?

Infrastructure Grade

32% DC Fast

Based on DC Fast Charger ratio

23 of 72 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 34
Ports per Station 2.1

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Monroeville, Pennsylvania has 34 publicly accessible EV charging stations with 72 charging ports. ChargePoint Network operates 73.5% of stations in the area, followed by Non-Networked at 8.8% — part of Pennsylvania's 2,153 stations statewide.

32% of ports (23) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 68% (49) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Pennsylvania's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Monroeville?

Strong Fast Charging Network

32% of charging ports in Monroeville are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Monroeville have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Monroeville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.