No working DC fast chargers in Howard yet
Just 4 Level 2 ports across Non-Networked.
Stations · 1
Which EV Charging Networks Operate in Howard, PA?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Howard, Pennsylvania has 1 publicly accessible EV charging station with 4 charging ports. Non-Networked operates 100% of stations in the area — part of Pennsylvania's 2,153 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 23 stations in nearby State College, approximately 31 miles away. See how PA compares with New York for broader regional context.
What Is the EV Charging Outlook for Howard?
Level 2 Focused Infrastructure
Howard's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Howard with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Howard average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Howard?
State College, Pennsylvania
Bellefonte, Pennsylvania
Altoona, Pennsylvania
Danville, Pennsylvania
Lewisburg, Pennsylvania
Williamsport, Pennsylvania
Enola, Pennsylvania
Muncy, Pennsylvania
Wellsboro, Pennsylvania
Lewistown, Pennsylvania
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."