3 EV Charging Stations in Coraopolis, PA
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Coraopolis — 1 FLO, 1 Tesla Destination, 1 EV Connect . Last updated May 9, 2026.
Where Are the 3 Charging Stations in Coraopolis?
Which EV Charging Networks Operate in Coraopolis, PA?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Coraopolis, Pennsylvania has 3 publicly accessible EV charging stations with 8 charging ports. FLO operates 33.3% of stations in the area, followed by Tesla Destination at 33.3% — part of Pennsylvania's 2,127 stations statewide.
All 8 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 321 stations in nearby Pittsburgh, approximately 23 miles away. See how PA compares with New York for broader regional context.
What Is the EV Charging Outlook for Coraopolis?
Level 2 Focused Infrastructure
Coraopolis's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Competitive Charging Market
No single network dominates Coraopolis, with 3 providers competing to offer the best charging experience.
Where Else Can I Charge Near Coraopolis?
Pittsburgh, Pennsylvania
Monroeville, Pennsylvania
Wexford, Pennsylvania
Youngstown, Ohio
Greensburg, Pennsylvania
Washington, Pennsylvania
Warren, Ohio
Triadelphia, West Virginia
INDIANA, Pennsylvania
Butler, Pennsylvania
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."