1 EV Charging Stations in Wagoner, OK
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Wagoner — 1 FCN , 12 public DC fast chargers. Last updated May 9, 2026.
Where Are the 1 Charging Stations in Wagoner?
Which EV Charging Networks Operate in Wagoner, OK?
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
12 of 12 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Wagoner, Oklahoma has 1 publicly accessible EV charging station with 12 charging ports. FCN operates 100% of stations in the area — part of Oklahoma's 437 stations statewide.
100% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.
Drivers needing more charging options can find 66 stations in nearby Tulsa, approximately 51 miles away. See how OK compares with Texas for broader regional context.
What Is the EV Charging Outlook for Wagoner?
High-Speed Charging Hub
Wagoner has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
FCN Stronghold
FCN leads the market in Wagoner with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Wagoner average 12.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Wagoner?
Tulsa, Oklahoma
Broken Arrow, Oklahoma
Tahlequah, Oklahoma
Catoosa, Oklahoma
Muskogee, Oklahoma
Pryor, Oklahoma
Owasso, Oklahoma
Sapulpa, Oklahoma
Roland, Oklahoma
Sand Springs, Oklahoma
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."