4 working DC-fast stations in Batavia
All verified working this week, with 1 Level 2 port across ChargePoint Network, Non-Networked, NOODOE.
Charging around Batavia, OH
Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.
City pages nearby
Active charging locations · 5
Showing 5 useful public-access records selected from 5 active locations. Counts distinguish locations from 8 ports and 8 connector-type records; availability is periodically refreshed, not live.
CDJR JEFF WYLER EXPRESS PLUS PL
1117 State Rte 32Cdjr Jeff Wyler Express Plus Pl on State Rte 32 has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.
UDF Bauer Rd
2222 Winemiller LaneUDF Bauer Rd on Winemiller Ln has 4 DC fast ports (CCS) on the NOODOE network.
JEFF WYLER ESTGTE CPE250 1
1117 State Rte 32Jeff Wyler Estgte Cpe250 1 on State Rte 32 has 1 DC fast port (CCS, Tesla/NACS) on the ChargePoint Network, open 24/7.
JEFF WYLER ESTGTE CPE250 2
1117 State Rte 32Jeff Wyler Estgte Cpe250 2 on State Rte 32 has 1 DC fast port (CCS, Tesla/NACS) on the ChargePoint Network, open 24/7.
Jeff Wyler Nissan
1117 State Route 32Jeff Wyler Nissan on State Route 32 has 1 Level 2 port, non-networked and free to use.
Local charging snapshot
Batavia charging basics
5 public stations with 8 charging ports. 7 DC fast ports (88%) for quicker stops , plus 1 Level 2 ports (13%) for longer stays.
AFDC data last synced October 13, 2026.
Charging costs and cheapest hours in Batavia
Cheapest time to charge today
Nearby city charging pages around Batavia
Cincinnati, Ohio
Dayton, Ohio
Hamilton, Ohio
Mason, Ohio
Oxford, Ohio
Miamisburg, Ohio
Wilmington, Ohio
Centerville, Ohio
Newport, Kentucky
Fairfield, Ohio
EV charging questions for Batavia
Which EV charging networks operate in Batavia, OH?
Batavia has 3 charging networks. ChargePoint Network operates 60% of stations, serving 5 total stations.
When is the cheapest time to charge an EV in Batavia?
Today's cheapest, greenest grid window in Batavia is 2 AM – 5 AM EDT, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Dataset snapshot: October 13, 2026. Availability is periodically refreshed.