3 EV Charging Stations in Mocksville, NC
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Mocksville — 1 ChargePoint Network, 1 Tesla, 1 EV Connect , 9 public DC fast chargers. Last updated May 9, 2026.
Where Are the 3 Charging Stations in Mocksville?
Which EV Charging Networks Operate in Mocksville, NC?
Infrastructure Grade
82% DC Fast
Based on DC Fast Charger ratio
9 of 11 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Mocksville, North Carolina has 3 publicly accessible EV charging stations with 11 charging ports. ChargePoint Network operates 33.3% of stations in the area, followed by Tesla at 33.3% — part of North Carolina's 2,023 stations statewide.
82% of ports (9) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 18% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 295 stations in nearby Charlotte, approximately 81 miles away. See how NC compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Mocksville?
High-Speed Charging Hub
Mocksville has exceptional DC fast charging coverage with 82% of ports being high-speed chargers, well above the national average.
Competitive Charging Market
No single network dominates Mocksville, with 3 providers competing to offer the best charging experience.
Where Else Can I Charge Near Mocksville?
Charlotte, North Carolina
Greensboro, North Carolina
Mooresville, North Carolina
Gastonia, North Carolina
Winston-Salem, North Carolina
Concord, North Carolina
Huntersville, North Carolina
Asheboro, North Carolina
Statesville, North Carolina
Burlington, North Carolina
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."