22 EV Charging Stations in Fayetteville, NC

Locations, networks, and charger types — updated weekly from U.S. DOE data

22
Charging Stations

22 EV charging stations in Fayetteville — 13 ChargePoint Network, 2 Non-Networked, 2 Blink Network , 29 public DC fast chargers. Last updated May 9, 2026.

Where Are the 22 Charging Stations in Fayetteville?

DoubleTree by Hilton Hotel - Tesla Supercharger

1965 Cedar Creek Road
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla

Cape Fear Valley Health System

1638 Owen Drive
24 hours daily
J1772 (Level 2)

Liberty Ford

256 Swain St
24 hours daily
FORD_CHARGE Public
CCS/SAE Combo

Lafayette Ford

5202 Raeford Rd
Mon: 8:00am-8:00pm; Tue: 8:00am-8:00pm; Wed: 8:00am-8:00pm; Thu: 8:00am-8:00pm; Fri: 8:00am-8:00pm; Sat: 9:00am-6:00pm
FORD_CHARGE Public
CCS/SAE Combo

Cadillac Of Fayetteville

1637 SKIBO RD
24 hours daily
EV Connect
J1772 (Level 2) CCS/SAE Combo

FAYETTEVILLE NC FRANKLIN 2

208 Franklin St
24 hours daily
J1772 (Level 2)

FPWC MARKETFAIR MALL

5084-5398 Campground Rd
24 hours daily
J1772 (Level 2)

PEMBROKE HQ HI-EXPRESS 1

2521 Two Bale Ln
24 hours daily
J1772 (Level 2)

FAYETTEVILLE NC TRANS MUSEUM

302 W Russell St
24 hours daily
J1772 (Level 2)

FAYETTEVILLE NC FRANKLIN 3

208 Franklin St
24 hours daily
J1772 (Level 2)

FAYETTEVILLE NC FRANKLIN 1

208 Franklin St
24 hours daily
J1772 (Level 2)

West Park Apartments

5600 Fountain Grove Circle
24 hours daily
$2.00-$3.00/kWh Variable Energy Fee
J1772 (Level 2)

ADDISON RIDGE STATION 4

730 Piper Farm Rd
24 hours daily
J1772 (Level 2)

Stay-N-Charge EV Charging Station - Holiday Inn Express & Suites Fayetteville South

1894 Cedar Creek Rd
24 hours daily; for guest use only
$0.45 per kWh
STAY_N_CHARGE Hotel
J1772 (Level 2)

Fred Anderson Nissan

4559 Raeford Rd
Non-Networked Car Dealer
J1772 (Level 2)

VISN 6/FAYETTEVILLE NC VAMC

2300 Ramsey St
Accepts fleet card
$0.13 per kWh
Non-Networked Fed Gov
J1772 (Level 2)

LEE HYUNDAI CPE25O DC1

1960 Skibo Rd
Mon: 8:00am-8:00pm; Tue: 8:00am-8:00pm; Wed: 8:00am-8:00pm; Thu: 8:00am-8:00pm; Fri: 8:00am-8:00pm; Sat: 8:00am-8:00pm; Sun: 8:00am-8:00pm
CHAdeMO (DC Fast) CCS/SAE Combo
1 station reported unavailable as of 2026-05-09 See full North Carolina outage report →

Which EV Charging Networks Operate in Fayetteville, NC?

Infrastructure Grade

48% DC Fast

Based on DC Fast Charger ratio

29 of 60 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 22
Ports per Station 2.7

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Fayetteville, North Carolina has 22 publicly accessible EV charging stations with 60 charging ports. ChargePoint Network operates 59.1% of stations in the area, followed by Non-Networked at 9.1% — part of North Carolina's 2,023 stations statewide.

48% of ports (29) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 52% (31) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how North Carolina's EV infrastructure compares with Georgia.

What Is the EV Charging Outlook for Fayetteville?

Strong Fast Charging Network

48% of charging ports in Fayetteville are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Fayetteville have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Fayetteville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Fayetteville

1 hotel with on-site EV charging · 2 Level 2 ports

Stay-N-Charge EV Charging Station - Holiday Inn Express & Suites Fayetteville South

Level 2

1894 Cedar Creek Rd

🔌 2 ports · Public

Level 2: ~40–80mi range added per hour overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)