No working DC fast chargers in Atlantic Beach yet
Just 10 Level 2 ports across ENVIROSPARK, Non-Networked.
Stations · 2
Which EV Charging Networks Operate in Atlantic Beach, NC?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 10 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Atlantic Beach, North Carolina has 2 publicly accessible EV charging stations with 10 charging ports. ENVIROSPARK operates 50% of stations in the area, followed by Non-Networked at 50% — part of North Carolina's 2,003 stations statewide.
All 10 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 18 stations in nearby New Bern, approximately 54 miles away. See how NC compares with Georgia for broader regional context.
What Is the EV Charging Outlook for Atlantic Beach?
Level 2 Focused Infrastructure
Atlantic Beach's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
High-Capacity Stations
Charging stations in Atlantic Beach average 5.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Atlantic Beach?
New Bern, North Carolina
Jacksonville, North Carolina
Beaufort, North Carolina
Morehead City, North Carolina
Havelock, North Carolina
Camp Lejeune, North Carolina
Oriental, North Carolina
Cherry Point, North Carolina
Hampstead, North Carolina
Surf City, North Carolina
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Atlantic Beach
1 hotel with on-site EV charging · 6 Level 2 ports
Sand Piper Motel
Level 2200 E Fort Macon Rd
Level 2: full charge (~200–300mi) in 8 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."