Questions about EV charging?

Latest reported · Nov 9, 2026

5 working DC-fast stations in Webster

Plus 1 reported down this week and 51 Level 2 ports across ChargePoint Network, VIALYNK, EVOKE.

Latest reported availability
5 working now 1 reported down

Charging around Webster, NY

Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.

Map of Webster charging stations
The interactive map loads as you scroll here. Every station is also listed below.
Loading map…

Active charging locations · 27

94% working at New York · verified Nov 9, 2026

Showing 20 useful public-access records selected from 27 active locations. Counts distinguish locations from 57 ports and 27 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Webster

East · Holt Rd
5 stations · closest 1.6 km from downtown
Southwest · Baytowne Plaza 1900 Empire Blvd
2 stations · closest 3.6 km from downtown
RTS BAYTOWNE 2· 2 Level 2
North · Lake Rd Webster Park
2 stations · closest 5.5 km from downtown

WEST HERR AUTO WH FW L3-1 EXPP

810 NY-404

West Herr Auto Wh Fw L3-1 Expp on Ny-404 has 2 DC fast ports (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 2 ports CCS/SAE Combo

WEBSTER HOLT 02

1070 Ridge Road

Webster Holt 02 on Ridge Rd has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

WEBSTER HOLT 01

1070 Ridge Road

Webster Holt 01 on Ridge Rd has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

WEBSTER HOLT 04

1070 Ridge Road

Webster Holt 04 on Ridge Rd has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

WEBSTER HOLT 03

1070 Ridge Road

Webster Holt 03 on Ridge Rd has 1 DC fast port (CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo

629 Ridge Rd Parking Lot

629 Ridge Rd

629 Ridge Rd Parking Lot on Ridge Rd has 2 Level 2 ports on the EVOKE network, open 24/7.

Working
EVOKE Level 2 2 ports J1772

TUV Rheinland

710 Resende Rd

TUV Rheinland on Resende Rd has 2 Level 2 ports on the AMPUP network.

Working
AMPUP Level 2 2 ports J1772

Front Lot

920 Cherry Ridge Blvd

Front Lot on Cherry Ridge Blvd has 2 Level 2 ports on the EVOKE network, open 24/7.

Working
EVOKE Level 2 2 ports J1772

Rear Lot

920 Cherry Ridge Blvd

Rear Lot on Cherry Ridge Blvd has 2 Level 2 ports on the EVOKE network, open 24/7.

Working
EVOKE Level 2 2 ports J1772

RTS BAYTOWNE 2

Baytowne Plaza 1900 Empire Blvd

Rts Baytowne 2 on Baytowne Plaza 1900 Empire Blvd has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

RTS BAYTOWNE 1

Baytowne Plaza 1900 Empire Blvd

Rts Baytowne 1 on Baytowne Plaza 1900 Empire Blvd has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

Waters Edge - Runabout Lane

300 Starboard Side Ln

Waters Edge - Runabout Lane on Starboard Side Ln has 4 Level 2 ports on the VIALYNK network, open 24/7.

Working
VIALYNK Level 2 4 ports J1772

Auto Outlets - Webster

824 Ridge Rd

Auto Outlets - Webster on Ridge Rd has 1 Level 2 port, non-networked and open 24/7.

Working
Non-Networked Level 2 1 port J1772

Bradford Hill

1045 Floribunda Way

Bradford Hill on Floribunda Way has 4 Level 2 ports on the VIALYNK network, open 24/7.

Working
VIALYNK Level 2 4 ports J1772

Preserve at Wood Creek

639 Preservation Trail

Preserve at Wood Creek on Preservation Trl has 4 Level 2 ports on the VIALYNK network, open 24/7.

Working
VIALYNK Level 2 4 ports J1772

Waters Edge - Anchor Line Dr

300 Starboard Side Ln

Waters Edge - Anchor Line Dr on Starboard Side Ln has 4 Level 2 ports on the VIALYNK network, open 24/7.

Working
VIALYNK Level 2 4 ports J1772

MONROE COUNTY WEBSTER N1

1105 Lake Rd Webster Park

Monroe County Webster on Lake Rd Webster Park has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

MAPLEWOODCC CHARGER 3

100 Daniel Drive

Maplewoodcc Charger 3 on Daniel Dr has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

MAPLEWOODCC CHARGER RIGHT 4

100 Daniel Drive

Maplewoodcc Charger Right 4 on Daniel Dr has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

MAPLEWOODCC CHARGER 2

100 Daniel Drive

Maplewoodcc Charger 2 on Daniel Dr has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

Local charging snapshot

Webster charging basics

27 public stations with 57 charging ports. 6 DC fast ports (11%) for quicker stops , plus 51 Level 2 ports (89%) for longer stays.

AFDC data last synced November 9, 2026.

27
stations
57
ports
6
DC fast
51
Level 2
Charging costs and cheapest hours in Webster
Home charging costs
Compare New York electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Webster today is 2 AM – 5 AM EST, based on NYISO (New York) day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Webster

EV charging questions for Webster

Which EV charging networks operate in Webster, NY?

Webster has 5 charging networks. ChargePoint Network operates 66.7% of stations, serving 27 total stations.

What is the EV charging outlook for Webster?

11% of Webster's charging ports are DC fast chargers and 89% are Level 2. The city has diverse network coverage with 5 providers.

When is the cheapest time to charge an EV in Webster?

Today's cheapest, greenest grid window in Webster is 2 AM – 5 AM EST, based on NYISO (New York) day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: November 9, 2026. Availability is periodically refreshed.