171 EV Charging Stations in Buffalo, NY

Locations, networks, and charger types — updated weekly from U.S. DOE data

171
Charging Stations

171 EV charging stations in Buffalo — 118 ChargePoint Network, 15 EV Connect, 7 Non-Networked , 24 public DC fast chargers. Last updated May 9, 2026.

Where Are the 171 Charging Stations in Buffalo?

National Grid - Buffalo (Dewey)

93 Dewey Ave
Non-Networked Utility
J1772 (Level 2)

Adams Parking Ramp

343 Washington St
24 hours daily
EV Connect
J1772 (Level 2)

Genesee Towers

257W Genesee St #100
24 hours daily
VIALYNK
J1772 (Level 2)

Home2 Suites Amherst Buffalo

3820 Ridge Lea Road
24 hours daily
CHARGESMART_EV
J1772 (Level 2)

Augspurger Parking Ramp

362 Pearl St
24 hours daily
EV Connect
J1772 (Level 2)

Extended Stay America

901 Dick Road
24 hours daily
CHARGESMART_EV
J1772 (Level 2)

95 Perry St

95 Perry St
24 hours daily
VIALYNK
J1772 (Level 2)

Courtyard Amherst Buffalo

4100 Sheridan Dr
24 hours daily
CHARGESMART_EV
J1772 (Level 2)

Shops at Main / Transit - Tesla Supercharger

4455 Transit Road
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla

Turner Parking Ramp

1 Perkins Dr.
24 hours daily
EV Connect
J1772 (Level 2)

Fernbach Parking Ramp

200 Pearl St
24 hours daily
EV Connect
J1772 (Level 2)

Econo Lodge Buffalo South

4344 Milestrip Rd
24 hours daily
VIALYNK
J1772 (Level 2) CCS/SAE Combo

Douglas Development - All Pro Parking

50 Exchange St
Contact station for hours of availability
AMPUP Parking Garage
J1772 (Level 2)

Visitor Parking Lot

553 Washington St
24 hours daily
FLO
J1772 (Level 2)

Employee Parking Lot

553 Washington St
24 hours daily
FLO
J1772 (Level 2)

Pinto Construction Co

132 Dingens St
RED_E Public
J1772 (Level 2)

POE Buffalo - Peace Bridge Main Building

956 Busti Ave
Non-Networked Fed Gov
NEMA 14-50

Main Place Parking Garage

221 Pearl St
24 hours daily
EV Connect
J1772 (Level 2)

TownePlace Suites - Buffalo Airport

4265 Genesee St
24 hours daily; chargers for guest use only
Free
Non-Networked Hotel
J1772 (Level 2)

Rich Products

1197 Niagara St
24 hours daily; employee use only
Free
EV Connect Office Bldg
J1772 (Level 2)
4 stations reported unavailable as of 2026-05-09 — check before driving See full New York outage report →

Which EV Charging Networks Operate in Buffalo, NY?

Infrastructure Grade

5% DC Fast

Based on DC Fast Charger ratio

24 of 477 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 171
Ports per Station 2.8

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Buffalo, New York has 171 publicly accessible EV charging stations with 477 charging ports. ChargePoint Network operates 69% of stations in the area, followed by EV Connect at 8.8% — part of New York's 5,508 stations statewide.

5% of ports (24) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 95% (453) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how New York's EV infrastructure compares with Massachusetts.

What Is the EV Charging Outlook for Buffalo?

Level 2 Focused Infrastructure

Buffalo's charging network emphasizes Level 2 charging (95% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 15 different charging networks available, EV drivers in Buffalo have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Buffalo?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Buffalo

1 hotel with on-site EV charging · 4 Level 2 ports

TownePlace Suites - Buffalo Airport

Level 2

4265 Genesee St

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"We are putting in charging stations where people are, where people are running errands. They're going grocery shopping, they go to work. That's where we put our charging stations."

Badar Khan

CEO, EVgo

Source: Yahoo Finance (March 2025)