Verified · Jun 21, 2026

5 working DC fast chargers in Taos

All verified working this week, with 15 Level 2 ports across RED_E, ChargePoint Network, Tesla.

Live reliability
5 working now none down

Stations · 13

98% working at New Mexico · verified Jun 7, 2026

Smith's - Tesla Supercharger

224 Paseo Del Pueblo Sur
Working
Tesla DC Fast 8 ports Tesla
98% working
Working
RED_E DC Fast 4 ports CCS/SAE Combo
96% working

Taos Center for the Arts

133 Paseo del Pueblo Norte
Working
RED_E Level 2 3 ports J1772
96% working

Taos Public Library

402 Camino De La Placita
Working
RED_E Level 2 2 ports J1772
96% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Guadalupe Parking Lot DCFC

205 Don Fernando St
Working
RED_E DC Fast 2 ports CCS/SAE Combo
96% working

KTAO Park Ride

9 NM-150
Working
RED_E Level 2 2 ports J1772
96% working

TAOS COUNTY EV AC STATION W 1

109 Albright St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

TAOS COUNTY EV AC STATION E 2

109 Albright St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Kit Carson Cruz Alta

118 Cruz Alta Rd
Working
RED_E Level 2 1 port J1772
96% working
Working
RED_E Level 2 1 port J1772
96% working

TAOS COUNTY EV DC STATION 1

105 Albright St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

TAOS COUNTY EV DC STATION 2

105 Albright St
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo + Tesla
99% working
Home charging in New Mexico costs 14.81¢/kWh — a full charge (60 kWh) costs about $8.89. Compare electricity prices →
All 13 stations active as of 2026-06-21 See full New Mexico outage report →

Charge While You Sleep in Taos

4 hotels offer on-site EV charging — 10 Level 2 ports, 1 Tesla Destination. Wake up to a full battery.

Hotels with EV Charging in Taos, New Mexico →

Which EV Charging Networks Operate in Taos, NM?

Infrastructure Grade

52% DC Fast

Based on DC Fast Charger ratio

16 of 31 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 13
Ports per Station 2.4

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Taos, New Mexico has 13 publicly accessible EV charging stations with 31 charging ports. RED_E operates 53.8% of stations in the area, followed by ChargePoint Network at 38.5% — part of New Mexico's 520 stations statewide.

52% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 48% (15) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.

For regional context, see how New Mexico's EV infrastructure compares with Texas.

What Is the EV Charging Outlook for Taos?

High-Speed Charging Hub

Taos has exceptional DC fast charging coverage with 52% of ports being high-speed chargers, well above the national average.

Where Else Can I Charge Near Taos?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Taos

4 hotels with on-site EV charging · 1 Tesla Destination · 10 Level 2 ports

See all 4 hotels →

El Monte Sagrado Resort

Level 2

317 Kit Carson Rd

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.