12 EV Charging Stations in Farmington, NM

Locations, networks, and charger types — updated weekly from U.S. DOE data

12
Charging Stations

12 EV charging stations in Farmington — 6 ChargePoint Network, 2 Tesla, 1 Tesla Destination , 18 public DC fast chargers. Last updated May 9, 2026.

Where Are the 12 Charging Stations in Farmington?

Target - Tesla Supercharger

4900 E Main St
24 hours daily
Tesla Shopping Center
Tesla

Marriott TownePlace Suites Farmington - Tesla Supercharger

4200 Sierra Vista Drive
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla

3401 East 30th Street

3401 E 30th St
24 hours daily
$1 activation fee; $0.59 per kWh
LOOP Other
CHAdeMO (DC Fast) CCS/SAE Combo

FEUS DOWNTOWN PRKING

105 N Orchard Ave
24 hours daily
J1772 (Level 2)

FEUS FARM. LIBRARY

2000 E 20th St
24 hours daily
J1772 (Level 2)

FEUS FARM. MUSEUM

3009 E Main St
24 hours daily
J1772 (Level 2)

FEUS ANIM.VALL. MALL

4601 East Main St
24 hours daily
J1772 (Level 2)

Ziems Ford Corners

5700 E Main St
24 hours daily
Non-Networked Car Dealer
J1772 (Level 2)

HI COUNTRY KIA ABB STATION 1

4004 E Main St
24 hours daily
CCS/SAE Combo

HI Country Buick GMC

1700 E SAN JUAN BLVD
24 hours daily
EV Connect
CCS/SAE Combo
All 12 stations active as of 2026-05-09 See full New Mexico outage report →

Which EV Charging Networks Operate in Farmington, NM?

Infrastructure Grade

58% DC Fast

Based on DC Fast Charger ratio

18 of 31 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 12
Ports per Station 2.6

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Farmington, New Mexico has 12 publicly accessible EV charging stations with 31 charging ports. ChargePoint Network operates 50% of stations in the area, followed by Tesla at 16.7% — part of New Mexico's 511 stations statewide.

58% of ports (18) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 42% (13) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how New Mexico's EV infrastructure compares with Texas.

What Is the EV Charging Outlook for Farmington?

High-Speed Charging Hub

Farmington has exceptional DC fast charging coverage with 58% of ports being high-speed chargers, well above the national average.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Farmington have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Farmington?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Farmington

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

Casa Blanca Inn

⚡ Tesla

505 E La Plata St

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)