2 EV Charging Stations in Ridgefield, NJ
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in Ridgefield — 1 ChargePoint Network, 1 APPLEGREEN , 8 public DC fast chargers. Last updated May 9, 2026.
Where Are the 2 Charging Stations in Ridgefield?
Which EV Charging Networks Operate in Ridgefield, NJ?
Infrastructure Grade
80% DC Fast
Based on DC Fast Charger ratio
8 of 10 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Ridgefield, New Jersey has 2 publicly accessible EV charging stations with 10 charging ports. ChargePoint Network operates 50% of stations in the area, followed by APPLEGREEN at 50% — part of New Jersey's 1,930 stations statewide.
80% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 20% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 440 stations in nearby New York, approximately 8 miles away. See how NJ compares with New York for broader regional context.
What Is the EV Charging Outlook for Ridgefield?
High-Speed Charging Hub
Ridgefield has exceptional DC fast charging coverage with 80% of ports being high-speed chargers, well above the national average.
High-Capacity Stations
Charging stations in Ridgefield average 5.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Ridgefield?
New York, New York
Brooklyn, New York
Haverstraw, New York
Newark, New Jersey
Jersey City, New Jersey
Queens, New York
Stamford, Connecticut
Yonkers, New York
White Plains, New York
Mahwah, New Jersey
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."