Verified · Jun 21, 2026

No working DC fast chargers in Franklin Lakes yet

Just 6 Level 2 ports across ChargePoint Network, Tesla Destination.

Live reliability
0 working now none down

Stations · 2

97% working at New Jersey · verified Jun 7, 2026

Becton Dickinson & Co. - Tesla Destination

1 Becton Dr
Working
Tesla Destination Level 2 4 ports Tesla
98% working

BOROUGH HALL BOROUGH HALL1

480 DeKorte Drive
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in New Jersey costs 23.49¢/kWh — a full charge (60 kWh) costs about $14.09. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full New Jersey outage report →

Which EV Charging Networks Operate in Franklin Lakes, NJ?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 6 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 3.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Franklin Lakes, New Jersey has 2 publicly accessible EV charging stations with 6 charging ports. ChargePoint Network operates 50% of stations in the area, followed by Tesla Destination at 50% — part of New Jersey's 1,926 stations statewide.

All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

Drivers needing more charging options can find 440 stations in nearby New York, approximately 34 miles away. See how NJ compares with New York for broader regional context.

What Is the EV Charging Outlook for Franklin Lakes?

Level 2 Focused Infrastructure

Franklin Lakes's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near Franklin Lakes?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.