1 EV Charging Stations in Hookset, NH

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Hookset — 1 EVGATEWAY . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Hookset?

Waltham Residence

1359 hookset rd
24 hours daily
EVGATEWAY
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full New Hampshire outage report →

Which EV Charging Networks Operate in Hookset, NH?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Hookset, New Hampshire has 1 publicly accessible EV charging station with 2 charging ports. EVGATEWAY operates 100% of stations in the area — part of New Hampshire's 335 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 738 stations in nearby Boston, approximately 86 miles away. See how NH compares with Massachusetts for broader regional context.

What Is the EV Charging Outlook for Hookset?

Level 2 Focused Infrastructure

Hookset's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

EVGATEWAY Stronghold

EVGATEWAY leads the market in Hookset with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Hookset?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)