No working DC fast chargers in Lone Jack yet
Just 6 Level 2 ports across ChargePoint Network.
Stations · 3
EVERGY @BTLFLD CTR279C
105 E Battlefield Rd @ Battlefield Plaza ShopEVERGY @BTLFLD CTR279B
105 E Battlefield Rd @ Battlefield Plaza ShopEVERGY @BTLFLD CTR279A
105 E Battlefield Rd @ Battlefield Plaza ShopWhich EV Charging Networks Operate in Lone Jack, MO?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Lone Jack, Missouri has 3 publicly accessible EV charging stations with 6 charging ports. ChargePoint Network operates 100% of stations in the area — part of Missouri's 1,410 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 472 stations in nearby Kansas City, approximately 46 miles away. See how MO compares with Illinois for broader regional context.
What Is the EV Charging Outlook for Lone Jack?
Level 2 Focused Infrastructure
Lone Jack's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Lone Jack with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Lone Jack?
Kansas City, Missouri
Overland Park, Kansas
Olathe, Kansas
Lenexa, Kansas
Lee's Summit, Missouri
Leawood, Kansas
Blue Springs, Missouri
Shawnee, Kansas
Lawrence, Kansas
North Kansas City, Missouri
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."