Latest reported · Aug 10, 2026

1 working DC-fast station in Winona

All verified working this week, with 9 Level 2 ports across Non-Networked, Blink Network, ChargePoint Network.

Latest reported availability
1 working now none down

Active charging locations · 6

98% working at Minnesota · verified Aug 10, 2026

Showing 6 useful public-access records selected from 6 active locations. Counts distinguish locations from 10 ports and 6 connector-type records; availability is periodically refreshed, not live.

GM - Dahl Chevrolet Buick GMC

1201 US-61
Working
EV Connect DC Fast 1 port CCS/SAE Combo

Bluff Country Co-op

121 W 2nd St
Working
Non-Networked Level 2 1 port J1772

DAHLAUTO- TOYSALES-CT4000

1077 W Service Dr
Working
ChargePoint Network Level 2 2 ports J1772
Working
Blink Network Level 2 2 ports J1772

Dahl Chevrolet Buick GMC

1201 US-61
Working
Non-Networked Level 2 2 ports J1772
Working
Blink Network Level 2 2 ports J1772

Local charging snapshot

Winona charging basics

6 public stations with 10 charging ports. 1 DC fast ports (10%) for quicker stops , plus 9 Level 2 ports (90%) for longer stays.

AFDC data last synced August 10, 2026.

6
stations
10
ports
1
DC fast
9
Level 2
Charging costs and cheapest hours in Winona
Home charging costs
Compare Minnesota electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Winona today is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Winona

EV charging questions for Winona

Which EV charging networks operate in Winona, MN?

Winona has 4 charging networks. Non-Networked operates 33.3% of stations, serving 6 total stations.

What is the EV charging outlook for Winona?

10% of Winona's charging ports are DC fast chargers and 90% are Level 2.

When is the cheapest time to charge an EV in Winona?

Today's cheapest, greenest grid window in Winona is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.