Verified · Jun 21, 2026

1 working DC fast charger in Huchinson

All verified working this week, with 0 Level 2 ports across EVRANGE.

Live reliability
1 working now none down

Stations · 1

98% working at Minnesota · verified Jun 7, 2026

Crow River Winery - Huchinson, MN

14848 MN-7
Working
EVRANGE DC Fast 2 ports CCS/SAE Combo
98% working
Home charging in Minnesota costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full Minnesota outage report →

Which EV Charging Networks Operate in Huchinson, MN?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

2 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Huchinson, Minnesota has 1 publicly accessible EV charging station with 2 charging ports. EVRANGE operates 100% of stations in the area — part of Minnesota's 1,193 stations statewide.

100% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 148 stations in nearby Minneapolis, approximately 81 miles away. See how MN compares with Wisconsin for broader regional context.

What Is the EV Charging Outlook for Huchinson?

High-Speed Charging Hub

Huchinson has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

EVRANGE Stronghold

EVRANGE leads the market in Huchinson with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Huchinson?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.