2 EV Charging Stations in Port Austin, MI
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Port Austin, Michigan has 2 publicly accessible EV charging stations with 4 charging ports. Non-Networked operates 50% of stations in the area, followed by JULE at 50% — part of Michigan's 2,083 stations statewide.
50% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.
Drivers needing more charging options can find 14 stations in nearby Bay City, approximately 87 miles away. See how MI compares with Ohio for broader regional context.
2 EV charging stations in Port Austin — 1 Non-Networked, 1 JULE , 2 public DC fast chargers. Last updated March 2026.
Infrastructure Grade
50% DC Fast
Based on DC Fast Charger ratio
2 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Port Austin, MI?
Where Are the 2 Charging Stations in Port Austin?
Jule - Village of Port Austin
8861 Line StWhat Is the EV Charging Outlook for Port Austin?
High-Speed Charging Hub
Port Austin has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.
Where Else Can I Charge Near Port Austin?
Bay City, Michigan
Tawas City, Michigan
Bad Axe, Michigan
Harrisville, Michigan
Kawkawlin, Michigan
Marlette, Michigan
Sandusky, Michigan
Oscoda, Michigan
East Tawas, Michigan
North Branch, Michigan
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 22, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Port Austin
1 hotel with on-site EV charging
Jule - Village of Port Austin
DC Fast8861 Line St
DC Fast: 80% charge in 30–45 min
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."