Verified · Jun 21, 2026

1 working DC fast charger in Bad Axe

All verified working this week, with 1 Level 2 port across Non-Networked, Tesla, EV Connect.

Live reliability
1 working now none down

Stations · 3

97% working at Michigan · verified Jun 7, 2026

Meijer - Tesla Supercharger

100 Pigeon Road
Working
Tesla DC Fast 6 ports Tesla
98% working

Flannery Chevrolet

1225 Sand Beach Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Flannery Auto Mall

1225 Sand Beach Road
Working
EV Connect DC Fast 1 port CCS/SAE Combo
90% working
Home charging in Michigan costs 21.2¢/kWh — a full charge (60 kWh) costs about $12.72. Compare electricity prices →
All 3 stations active as of 2026-06-21 See full Michigan outage report →

Which EV Charging Networks Operate in Bad Axe, MI?

Infrastructure Grade

88% DC Fast

Based on DC Fast Charger ratio

7 of 8 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 2.7

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Bad Axe, Michigan has 3 publicly accessible EV charging stations with 8 charging ports. Non-Networked operates 33.3% of stations in the area, followed by Tesla at 33.3% — part of Michigan's 2,139 stations statewide.

88% of ports (7) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 13% (1) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 19 stations in nearby Saginaw, approximately 88 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Bad Axe?

High-Speed Charging Hub

Bad Axe has exceptional DC fast charging coverage with 88% of ports being high-speed chargers, well above the national average.

Competitive Charging Market

No single network dominates Bad Axe, with 3 providers competing to offer the best charging experience.

Where Else Can I Charge Near Bad Axe?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.